BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2023 at 8:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Frontenac, Missouri. Completed plans call for site work for a water / sewer project.

Contract consists of the construction of approximately 228 lineal feet of pipe sewers, varying in size from 12" to 18" in diameter and appurtenances to be constructed. Located south of I-64 and west of South Lindbergh Blvd, in the City of Frontenac, Missouri. the District to begin and shall complete all work within one hundred eighty (180) calendar days. The District reserves the right to reject any and all bids, offers or proposals submitted, to accept the proposal that it deems to be to its best interest, or to advertise for new bids. The District reserves the right to defer the acceptance of any proposal and the award and execution of a contract for a period not exceeding ninety (90) days after the date of opening the bids. The successful bidder, whose proposal has been accepted, shall sign the Contract in duplicate, and return the signed documents within fifteen (15) days after the date of their receipt. At the same time the successful bidder shall also file with the District two (2) copies of both a Contract Bond for one hundred (100%) percent of the contract amount, and an acceptable Certificate of Insurance and Insurance Binder or policy for the required insurance coverage. The Metropolitan St. Louis Sewer District (District) has established a total combined goal of at least 17 percent for Minority Business Enterprise (MBE) (African American) utilization for all non-building construction contracts in the amount of $50,000 or more. Additional workforce requirements apply to contracts in the amount of $500,000 or more. These requirements are further explained in the attached MBE Utilization and Workforce Program Non-Building Construction Projects procedure. All bidders including certified Prime MBE's must achieve the required 17.00% MBE (African American) subcontract utilization goal by obtaining the additional participation from certified MBE's. The Bid Proposal shall be prepared on a Proposal Form, provided by the District, in accordance with Section 2.3, FORM OF PROPOSAL, of the General Project Specifications. Bids not submitted on District provided forms will be rejected. The proposal shall be accompanied by a certified check or cashier's check on a bank or trust company in St. Louis County or in the City of St. Louis or by a bidder's bond, for an amount not less than five (5%) percent of the bid amount as bid security to the District. CONTACT THE PROJECT ENGINEER, DANNY H GARCIA, AT 314-335-2065, REGARDING TECHNICAL QUESTIONS. Question Deadline 07/27/2023 Online Q/A

Bid Results

Water / Sewer

$49,830.00

Public - City

Site Work

4

5

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
84
Bidding Soon
1,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

August 31, 2023

Project location map

S Lindbergh Blvd, Frontenac, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.