Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in East Lynn, Massachusetts. Completed plans call for the renovation of a educational facility.
**As of September 13, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Renovations of the HVAC system within the Sisson Elementary School. Equipment, piping and controls are to be replaced for a fully functional HVAC system for the school. In addition, there are ADA renovations which add a LULA lift and an ADA compliant Toilet room within the existing building. QUESTIONS: All questions must be submitted in writing by email only, addressed to the Authority's Architect: Raymond Design Associates, Inc. Attn: John Bartecchi Email: jbartecchi@rda-design.com Questions must be received by the RDA no later than 4:00 PM on July 19, 2023. Responses to questions will be provided by 2:00 PM on July 20, 2023. PROJECT DESCRIPTION A. Work covered by Contract Documents: The project consists of the removal and replacement of the HVAC system within the existing 2 story Classroom Wing, Cafeteria and Gymnasium. New Boiler Room and Rooftop Equipment will be required. There is an ADA compliance scope item to install a LULA lift for access to the upper level and an ADA accessible Toilet Room. The City is contracting for the abatement of hazardous materials within the interior of the building through outside contractors prior to and in conjunction with this project timeline. Hazardous material abatement at new and modified existing mechanical penetrations are the scope of this contract. 1. Project Address: Sisson Elementary School 58 Conomo Ave Lynn, MA 01905 2. Work included beyond the Contract Limits: The site is within a residential urban neighborhood. Site access, trucking routing and non-interruption of street logistics co-ordination and plan submittal is paramount in the execution of this contract 3. Completeness: The Work shall be as shown on the Drawings and be complete in every respect and in conformance with all applicable requirements of the governing laws and codes. B. Contract time: The Construction Manager may begin on-site work on, or after receipt of a written Notice to Proceed, or suitable Letter of Intent. After commencement of work, the Contractor shall pursue the Work continuously and with diligence, and bring the occupied portions of the renovations to substantial completion prior to start of school year 2024 and have the heating plant on line and commissioned prior to Oct 1, 2024. 1. Project will be available to the Contractor on August 7, 2023. 2. The submittal and ordering of equipment is paramount to the schedule. It is anticipated that the bulk of the work will be performed on 2 nd shift and during vacations. The school will remain occupied throughout the school year 2023/2024. 3. Liquidated Damages are to assessed at $1,500 / Calendar Day beyond the 2024 school opening and/or the October 1 st , commissioning deadline. Bid Results :: 04 20 00.FSB Masonry :: The Waterproofing Company :: $28,500.00 09 50 00.FSB Acoustical Tile :: Cheviot Corporation :: $114,992.00 22 00 00.FSB Plumbing :: E. Amanti & Sons, Inc :: $98,000.00 26 00 00.FSB Electrical Work :: Your Electrical Solution, :: $237,500.00
Bid Results
Educational
$28,500.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2023
August 22, 2023
58 Conomo Ave, East Lynn, MA
Related To This Project
East Lynn, MA
Bid Date: Aug 10 2023
East Lynn, MA
Bid Date: Aug 10 2023
East Lynn, MA
--
East Lynn, MA
Bid Date: Sep 07 2023
East Lynn, MA
Bid Date: Mar 03 2022
East Lynn, MA
Bid Date: Mar 01 2022
East Lynn, MA
Bid Date: Oct 25 2023
East Lynn, MA
Bid Date: Jan 18 2024
East Lynn, MA
Bid Date: Aug 04 2023
East Lynn, MA
Bid Date: Jun 23 2023
East Lynn, MA
Bid Date: Feb 09 2023
East Lynn, MA
Bid Date: Jan 31 2023
East Lynn, MA
Bid Date: Mar 01 2022
East Lynn, MA
Bid Date: Jul 01 2021
East Lynn, MA
Bid Date: Jun 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.