BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in East Lynn, Massachusetts. Completed plans call for the renovation of a educational facility.

**As of September 13, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Renovations of the HVAC system within the Sisson Elementary School. Equipment, piping and controls are to be replaced for a fully functional HVAC system for the school. In addition, there are ADA renovations which add a LULA lift and an ADA compliant Toilet room within the existing building. QUESTIONS: All questions must be submitted in writing by email only, addressed to the Authority's Architect: Raymond Design Associates, Inc. Attn: John Bartecchi Email: jbartecchi@rda-design.com Questions must be received by the RDA no later than 4:00 PM on July 19, 2023. Responses to questions will be provided by 2:00 PM on July 20, 2023. PROJECT DESCRIPTION A. Work covered by Contract Documents: The project consists of the removal and replacement of the HVAC system within the existing 2 story Classroom Wing, Cafeteria and Gymnasium. New Boiler Room and Rooftop Equipment will be required. There is an ADA compliance scope item to install a LULA lift for access to the upper level and an ADA accessible Toilet Room. The City is contracting for the abatement of hazardous materials within the interior of the building through outside contractors prior to and in conjunction with this project timeline. Hazardous material abatement at new and modified existing mechanical penetrations are the scope of this contract. 1. Project Address: Sisson Elementary School 58 Conomo Ave Lynn, MA 01905 2. Work included beyond the Contract Limits: The site is within a residential urban neighborhood. Site access, trucking routing and non-interruption of street logistics co-ordination and plan submittal is paramount in the execution of this contract 3. Completeness: The Work shall be as shown on the Drawings and be complete in every respect and in conformance with all applicable requirements of the governing laws and codes. B. Contract time: The Construction Manager may begin on-site work on, or after receipt of a written Notice to Proceed, or suitable Letter of Intent. After commencement of work, the Contractor shall pursue the Work continuously and with diligence, and bring the occupied portions of the renovations to substantial completion prior to start of school year 2024 and have the heating plant on line and commissioned prior to Oct 1, 2024. 1. Project will be available to the Contractor on August 7, 2023. 2. The submittal and ordering of equipment is paramount to the schedule. It is anticipated that the bulk of the work will be performed on 2 nd shift and during vacations. The school will remain occupied throughout the school year 2023/2024. 3. Liquidated Damages are to assessed at $1,500 / Calendar Day beyond the 2024 school opening and/or the October 1 st , commissioning deadline. Bid Results :: 04 20 00.FSB Masonry :: The Waterproofing Company :: $28,500.00 09 50 00.FSB Acoustical Tile :: Cheviot Corporation :: $114,992.00 22 00 00.FSB Plumbing :: E. Amanti & Sons, Inc :: $98,000.00 26 00 00.FSB Electrical Work :: Your Electrical Solution, :: $237,500.00

Bid Results

Educational

$28,500.00

Public - City

Renovation

49

20

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
536
Active Projects
332
Bidding Soon
4,168
All Active Projects
1,755
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 24, 2023

August 22, 2023

November 11, 2024

img_map_placeholder

58 Conomo Ave, East Lynn, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.