BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Site work for a water / sewer project in Miramar, Florida. Conceptual plans call for site work for a water / sewer project.

Update:Lift Stations consist of pumps, pipelines, valves, wetwells, valve boxes, and a complex telemetry system (SCADA) that operate in a toxic and corrosive environment. Components are under continuous physical stress. Generally speaking, many lift stations have to be rebuilt every 15 to 25 years and some of them may have to be rebuilt sooner at higher capacity depending on various conditions. Routine lift station improvements can help reduce costly repair bills or equipment failures. This project covers over 136 lift stations that the City currently operates and maintains. The elimination of sewage spills, improved sewer maintenance, inspection of facilities and equipment and implementing long-term Capital Improvement programs such as this to renew aging infrastructure can reduce the possibility of fines and citations from government regulators and most importantly provides system reliability. Project is included in City of Miramar Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update : https://www.miramarfl.gov/DocumentCenter/View/30220/Adopted-Budget-2024-PDF Lift Stations consist of pumps, pipelines, valves, wetwells, valve boxes, and a complex telemetry system (SCADA) that operate in a toxic and corrosive environment. Components are under continuous physical stress. Generally speaking, many lift stations have to be rebuilt every 15 to 25 years and some of them may have to be rebuilt sooner at higher capacity depending on various conditions. Routine lift station improvements can help reduce costly repair bills or equipment failures. This project covers over 136 lift stations that the City currently operates and maintains. The elimination of sewage spills, improved sewer maintenance, inspection of facilities and equipment and implementing long-term Capital Improvement programs such as this to renew aging infrastructure can reduce the possibility of fines and citations from government regulators and most importantly provides system reliability. Project is included City of Miramar Fiscal Year 2024-2028 page 81 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Lift Station Improvements FY-2023-2027 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$7,500,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
144
Bidding Soon
1,760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

To Be Determined, Miramar, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.