Renovation of a municipal facility in Springfield, Missouri. Completed plans call for the renovation of a municipal facility.

1. Demolition and the replacement of the existing HVAC system and all ductwork in the existing, two-story facility. New HVAC system to include a rooftop unit serving the laboratory and a VRF system with ventilation air supplied from a dedicated outdoor air unit for the existing clinic, office, and support areas. 2. No demolition or new work shall begin before the receipt of all the new equipment and materials. Each bid must be accompanied by a bid bond in the form of a cashier's check made payable to the City of Springfield - Director of Finance, or a bid bond duly executed by the bidder as principal and having as surety thereon a surety company satisfactory to the City. The bond so furnished shall be in the amount not less than five percent (5%) of the amount of the total bid price. The Contractor shall furnish a Performance Bond and a Labor and Materials Payment Bond with surety approved by the City and on the forms approved by the City. Each bond shall be in the full amount of the contract conditioned upon the full and faithful performance of all major terms and conditions of this contract and payment of all labor and material suppliers. In submitting this bid, the bidder further agrees to pay to or allow the City as liquidated damages the sum of five hundred dollars ($500.00), for each calendar day thereafter that the work does not achieve Substantial Completion for Phase I and five hundred dollars ($500.00), for each calendar day thereafter that the work does not achieve Substantial Completion for Phase The Contractor agreesto bring the work to Final Completion within thirty (30) consecutive calendar daysfrom the date of Substantial Completion; the Contractor further agreesto pay to or allow the City as liquidated damages the sum of two hundred dollars ($200.00), for each calendar day thereafter that the work does not achieve Final Completion. The cutoff for any questions about this bid is July 19, 2023, at 3:00 P.M. (CST).

Bid Results

Municipal

$1,183,521.00

Public - City

Renovation

18

12

7

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
26
Bidding Soon
346
All Active Projects
127
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

September 1, 2023

img_map_placeholder

227 E Chestnut Expy, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.