BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2024 at 8:00 PM

Updated April 26, 2024

Site work and paving for a mixed-use development in Willmar, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work includes the construction of approximately: 1400 TONS BITUMINOUS PAVING 4874 CU YD COMMON EXCAVATION 2950 CU YD AGGREGATE BASE 950 LIN FT B612-B624 CURB & GUTTER 4700 SQ FT CONCRETE SIDEWALK 430 SQ YD CONCRETE DRIVEWAY 13500 SQ YD TURF ESTABLISHMENT 2200 SQ FT PAVEMENT MARKINGS Together with numerous related items of work, all in accordance with plans and specifications. This project is subject to prevailing wage rates, truck rentals, and responsible contractor certification. Bid documents are not yet available for download. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing to the Issuing Office. Contact information and submittal procedures for such questions are as follows: 2040 Hwy. 12 East, Willmar, MN, 56201-5818, (320) 231-3956, fax (320) 231-9710 The work will be substantially completed on or before 10/01/2024, and completed and ready for final payment in accordance with Paragraph 15.06 of Section 00 72 00 General Conditions of this Project Manual on or before 12/15/2024.

Award

Roads / Highways

$868,380.00

Public - City

Paving, Site Work

89

16

2

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
14
Bidding Soon
586
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

May 27, 2024

Project location map

19th Ave SW, Willmar, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.