BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Loveland, Colorado. Completed plans call civil work for a road / highway and sidewalk / parking lot.

The project generally includes demolition (curb & gutter, asphalt), overlot grading, erosion control, concrete curb & gutter, sidewalk, asphalt paving, striping, signage and all related work incidental to the completion of the project as per the acceptance requirements of Centerra Metropolitan District No. 1 and the City of Loveland. The project is located in the vicinity of Kendall Parkway and I-25 Loveland, CO. A bid bond in the amount of five percent (5%) of the total bid is required with each bid. Performance and payment bonds will be required of the successful bidder from a qualified surety. Bidders must possess the required licenses and insurance policies. Each bid must be accompanied by a qualification statement demonstrating present commitments, past performance, experience with comparable work, equipment available for this project, and resumes for key personnel who would be assigned to this project. No bid will be accepted from any firm, person, or corporation who is a defaulter to a surety or is deemed incompetent, irresponsible, or unreliable by the District. Each bid must be accompanied by a subcontractor and supplier list for proposed labor, services, and/or materials. Bidding contractors must self-perform a minimum of twenty percent (20%) of the work. The District may choose to schedule interviews with select bidders following the bid opening. Basis of the award of the contract will be to the lowest responsible and responsive bidder as solely determined by the District. The District reserves the right to reject any and all bids or to accept any bid or combination of bids which in its sole and absolute judgment will best serve the District's interest. /s/ Centerra Metropolitan District No. 1 Work is anticipated to start September 15, 2023 . Substantial completion by December 22, 2023.

Bid Results

Roads / Highways

$972,890.00

Public - City

Paving, Site Work

72

4

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
73
Bidding Soon
1,234
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2023

September 15, 2023

Project location map

Multiple Locations, Loveland, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.