BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Somis, California. Completed plans call for the renovation of a educational facility.

Preparation (with as needed incidental repairs), Renewal, Painting of Facility Exteriors and associated elements (fence walls, block walls, trellises, railings, ramps, etc.), Installation of new exterior signage (bid as a deductive alternate) throughout the school and others per Contract Documents. Contractor shall include in his base bid furnish and install 640 sq. ft. (20 4x8 sheets) of new T111 siding to replace most damaged siding in lieu of repair / patch. All exterior siding (new and repaired) to be finished / painted to a professional standard. All non-public access exteriors (i.e. playground areas accessible to school children) shall be prioritized as Phase 1. Limited school student attendance will be in place during the Summer School Session (from July 3 - July 28), and contractor shall take all legal and conventional precautions to insure NO direct worker / student interactions are allowed. Increased supervision and management of all materials (chemicals and or waste) shall be provided during these periods while children are present. Contractor will be allowed upon request to work double or 2 nd shifts entirely to speed up the safe progress of the work. The Phase 2 prep and painting of the public accessible perimeters of the school shall be allowed to occur past the 30 day calendar duration without risk of liquidated damages, but not beyond 60 calendar days past the Notice to Proceed date. Preparation (with as needed incidental repairs), Renewal, Painting of Facility Exteriors and associated elements (fence walls, block walls, trellises, railings, ramps, etc.), Installation of new signage throughout the school and others per Contract Documents PROJECT LOCATION: SOMIS SCHOOL- 5268 North St, Somis, CA 93066 All pre-bid RFI's by prospective bidders must be submitted via email to Tom Brown (tbrown@hple.co) and Jim Logsdon ( jlogsdon@hple.co ) A Payment Bond for contracts over $25,000 and a Performance Bond for all contracts will be required prior to commencement of work

Award

Educational

$112,350.00

Public - City

Renovation

20

16

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
68
Bidding Soon
1,698
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

July 17, 2023

img_map_placeholder

5268 North St, Somis, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.