BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2023 at 8:00 PM

Updated January 29, 2024

Site work and paving for a road / highway in Oroville, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The Butte County Public Works Department (County) is seeking proposals from a Firm or team of Firms (Proposer, Proposing Firm, Firm), to provide professional engineering, surveying, environmental, and right-of-way services. In general, the Firm shall be responsible for developing construction documents detailing the repair of Oro-Quincy Hwy at PM12.2 in Butte County. The format of SOQs submitted in response to this Solicitation shall adhere to the following requirements: Use 8-1/2" x 11" sheets (11" x 17" landscape format foldouts are acceptable for charts, images, etc.). The type size must be large enough to be easily legible. The type of font is unregulated. Include a cover letter signed by the authorized signatory of the prospective Consultant. Submissions may also include color and foldout charts and graphs. Foldout pages are not required. While page numbers are not limited, evaluations will account for efficient and concise prose and diction. o The County shall send confirmation within 24 hours of receiving a submittal. Questions and requests for clarification may only be submitted Electronically. Questions and the corresponding answers will be available to all potential Proposers and other interested parties. Questions shall be submitted no later than 5:00 PM on July 24, 2023. The County will provide answers and clarifications Electronically so all Responders receive consistent information. It is the responsibility of all interested Firms to access Electronically for this information. Questions received after the deadline will not be answered. Questions Answered Electronically No later than July 28, 2023 by 5:00 pm Preliminary Evaluation Completed August 11, 2023 Contract Negotiations No later than August 25, 2023 Award of Contract September 6th, 2023 The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$700,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
63
Bidding Soon
1,063
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

Project location map

Oroville Quincy Hwy, Oroville, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.