BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Oroville, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The Butte County Public Works Department (County) is seeking proposals from a Firm or team of Firms (Proposer, Proposing Firm, Firm), to provide professional engineering, surveying, environmental, and right-of-way services. In general, the Firm shall be responsible for developing construction documents detailing the repair of Oro-Quincy Hwy at PM12.2 in Butte County. The format of SOQs submitted in response to this Solicitation shall adhere to the following requirements: Use 8-1/2" x 11" sheets (11" x 17" landscape format foldouts are acceptable for charts, images, etc.). The type size must be large enough to be easily legible. The type of font is unregulated. Include a cover letter signed by the authorized signatory of the prospective Consultant. Submissions may also include color and foldout charts and graphs. Foldout pages are not required. While page numbers are not limited, evaluations will account for efficient and concise prose and diction. o The County shall send confirmation within 24 hours of receiving a submittal. Questions and requests for clarification may only be submitted Electronically. Questions and the corresponding answers will be available to all potential Proposers and other interested parties. Questions shall be submitted no later than 5:00 PM on July 24, 2023. The County will provide answers and clarifications Electronically so all Responders receive consistent information. It is the responsibility of all interested Firms to access Electronically for this information. Questions received after the deadline will not be answered. Questions Answered Electronically No later than July 28, 2023 by 5:00 pm Preliminary Evaluation Completed August 11, 2023 Contract Negotiations No later than August 25, 2023 Award of Contract September 6th, 2023 The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$700,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
31
Bidding Soon
623
All Active Projects
245
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

img_map_placeholder

Oroville Quincy Hwy, Oroville, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.