BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Grantsville, Utah. Working plans call for site work for a playground / park / athletic field.

This courtesy posting is an advertisement of a procurement opportunity for Tooele County, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The Division of Purchasing does not accept responses for courtesy postings. The contract award for this solicitation will not be posted . Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendors response will still be evaluated by Tooele County as described in the solicitation document. The Division of Purchasing is neither the issuing nor conducting procurement unit for this solicitation, as such it is the vendors responsibility to review the entire solicitation in order to comply with any requirements. Please note that there is a 50 MB limit on a single file upload. Acceptable File Types are DOC, DOCX, XLS, XLSX, CSV, PDF, PPT, JPG, GIF, PNG, TIFF, and .ZIP. The MAC Version of Word (Pages) is not an acceptable file type. The file must be converted to PDF to upload. Tooele County (County) is requesting proposals from a qualified company to design and build a destination playground for the Deseret Peak Complex (DPC), located at 2930 UT-112, in Grantsville, UT 84029. Please provide a detailed schedule the includes a completion date prior to December 31, 2023. Questions Due July 13, 2023 @ 4 PM Countys Response to Questions July 14, 2023 @ 4 PM If you need more information on this event, please contact: Cody Peterson codypeterson@utah.gov Successful offeror will be responsible for the following: Design of a modern destination playground at the Deseret Peak Complex. The approximate footprint of the playground should be 55,000 to 60,000 square feet, or 300' x 200' - including equipment, surfacing, benches, small pavilions, permanent shade structures (no canvas shades), and seating. All equipment and surfacing must meet and/or exceed all federal, state, CPSC, ASTM, & IPEMA guidelines. Playground should have a good variety of all abilities accessible features and apparatuses with high playability. Playground should have sections for different age groups Playground must include ziplines Playground must have a recognizable theme that relates to Tooele County. Multiple designs and themes can be submitted. Construction of playground - all equipment shall be installed by a factory trained and certified installer. Any and all sub-contractors and is to provide all labor, tools, equipment, permits, engineering, plans, and any and all other costs necessary to the design, layout, and construction. Successful offeror must coordinate with general contractor and project manager for time table to install playground

Final Planning

Playgrounds / Parks / Athletic Fields

$800,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
68
Bidding Soon
946
All Active Projects
381
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 26, 2023

February 4, 2024

December 31, 2023

img_map_placeholder

2930 UT-112, Grantsville, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.