BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Evergreen, Colorado. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of August 14, this project was postponed due to the lack of interest at the pre-bid conference. The project is expected to rebid in the future, however, a timeframe is not yet known. Reference Number 0000324518 This is a roadway project on JC-73, from Buffalo Park Road to Plettner Lane. The Contractor shall make improvements to the intersection of Buffalo Park Road. This includes the installation of new traffic signal poles and improvements to the turn lanes and pedestrian crossings. The Contractor shall make modifications to the existing structure at Buffalo Park Road and the existing structure on JC-73 near Plettner Lane. The Contractor shall install new structures at Little Cub Creek Road and at a private driveway crossing. The Contractor shall install a cast-in-place retaining wall, which is necessary for the installation of roadway widening, bike lanes, curb & gutter, and sidewalk. The Contractor shall install and manage any dewatering or creek diversion necessary for the construction of the retaining walls or structures. The Contractor shall complete the construction of off-street parking lots, storm sewer improvements, and a water quality basin. The Contractor shall coordinate with all utilities and construct the necessary water and sanitary adjustments. The Contractor shall mill, overlay, and restripe JC-73 prior to finishing the project. The project work consists of the installation and maintenance of the necessary erosion control measures and revegetation of the site. The Contractor shall coordinate with utility companies on the relocation of utilities throughout the project. The Contractor is responsible for all necessary traffic control measures during construction and for reducing and minimizing the impacts to traffic. The Contractor to coordinate any impacts with Jeffco Schools, Evergreen Fire Rescue, Jeffco Sheriffs Office, and other local stakeholders. Question Acceptance Deadline 07/27/2023 11:00 AM MDT Questions are submitted online No Participation Requirements - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Federally Funded - Insurance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 %

Final Planning

Roads / Highways

$200,000.00

Public - County

Paving, Site Work

483

6

5

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
56
Bidding Soon
1,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 7, 2023

Project location map

County Hwy 73, Evergreen, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.