BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Irvine, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of September 27,2023, project was awarded to Excel Paving Company, awarded amount is $4,398,989.08.** The project consists of work located both on IRWD property (outside the City of Irvine right-of-way) and work located within the City right-of-way. The proposed improvements include adding a new fourth leg to the existing three-legged Portola Parkway and Sand Canyon Avenue intersection. The fourth leg will provide a new entrance to IRWD's Syphon Reservoir site. The existing median on Portola Parkway will be modified to add a left turn lane for eastbound traffic into the reservoir site. Signing, striping, and traffic signals at this intersection will be modified and two existing streetlights located in the median will be relocated within the modified median. The on-site drainage components will be modified to tie-in to the existing storm drain system in Portola Parkway. The work shall generally include, but not be limited to, existing site feature demolition, earthwork, precise grading, site improvements, asphalt concrete paving, concrete, soil nail walls, signing and striping, traffic signals, drainage, fencing, Best Management Practices (BMP), erosion control, landscaping, irrigation, temporary utilities, and site security. DISTRICT's Representatives will decide any and all questions that may arise as to the interpretation of the Plans and specifications, and will have the authority to disapprove or reject materials and equipment furnished and work performed which, in their opinion, is not in accordance with the Contract Documents CONTRACTOR shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the Work, except as provided in the Special Provisions Under the provisions of the California Labor Code, the Director of the Department of Industrial Relations has determined the prevailing rate of wages for the locality in which the Work is to be performed and DISTRICT has adopted said prevailing rate of wages DISTRICT, however, reserves the right to reject any and all bids and to waive any informality in bids received.DISTRICT reserves the right to withhold payments to CONTRACTOR in the event of material noncompliance with insurance requirements. Question Deadline 08/21/2023 at 2:00 PM PT

Award

Roads / Highways

$4,398,989.00

Public - County

Paving, Site Work

60

20

12

3

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
111
Bidding Soon
2,430
All Active Projects
1,085
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2023

October 27, 2023

img_map_placeholder

Portola Pkwy & Sand Canyon Ave, Irvine, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.