BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2025 at 8:00 PM

Updated July 1, 2025

Site work, paving and outdoor lighting for a mixed-use development in Auburn, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Building permits were issued for this project in February of 2024. The general contractor has not been identified. Proposals from qualified consulting teams to provide professional services for the design, geotechnical evaluation and recommendations, environmental permitting documentation, cultural & historical review, and potentially right of way and/or construction assistance for the R Street SE and 21st Street SE Roundabout The project is located at the intersection of R Street SE and 21st Street SE. The intersection is currently a two-way stop-control intersection, existing sidewalk on both sides of R Street SE, a Rectangular Rapid Flashing Beacon (RRFB) on the north leg, and three street light poles. There are also existing underground utilities in various locations within and adjacent to the intersection. A single lane roundabout with splitter islands in place of the existing east/west two-way stop-control on R Street SE and 21st Street SE. Improving street lighting including a new power service. Rectangular Rapid Flashing Beacons at the pedestrian crossings. Upgrading curb ramps and damaged sidewalk. Storm drainage improvements associated with the roadway improvements. Replacing approximately 220 LF of 12-inch watermain and 355 LF of 16-inch watermain. Evaluating the subsurface conditions to provide utility trench and pavement This project has a voluntary 10% Small Business Enterprise (SBE) goal. Although the goal is voluntary, the outreach efforts to provide SBE maximum practicable opportunities are not. The SBE Participation Plan is required prior to commencing work Project design is anticipated to start in December 2023 and be complete by December 2024. Notify Firms Chosen for Interviews August 10, 2023 Consultant Interviews Week of August 21, 2023 Final Selection of Design Firm August 28, 2023 Execution of Consultant Agreement December 2023 The method of Contractor Selection has not been Determined at this time

Under Construction

Roads / Highways

$2,110,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
94
Bidding Soon
1,506
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

Project location map

21st St SE & R St SE, Auburn, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.