BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Auburn, Washington. Design plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

*As of May 16, 2024, a design firm has been selected and this project is in design. Construction is expected to begin in Spring of 2025. Proposals from qualified consulting teams to provide professional services for the design, geotechnical evaluation and recommendations, environmental permitting documentation, cultural & historical review, and potentially right of way and/or construction assistance for the R Street SE and 21st Street SE Roundabout The project is located at the intersection of R Street SE and 21st Street SE. The intersection is currently a two-way stop-control intersection, existing sidewalk on both sides of R Street SE, a Rectangular Rapid Flashing Beacon (RRFB) on the north leg, and three street light poles. There are also existing underground utilities in various locations within and adjacent to the intersection. A single lane roundabout with splitter islands in place of the existing east/west two-way stop-control on R Street SE and 21st Street SE. Improving street lighting including a new power service. Rectangular Rapid Flashing Beacons at the pedestrian crossings. Upgrading curb ramps and damaged sidewalk. Storm drainage improvements associated with the roadway improvements. Replacing approximately 220 LF of 12-inch watermain and 355 LF of 16-inch watermain. Evaluating the subsurface conditions to provide utility trench and pavement This project has a voluntary 10% Small Business Enterprise (SBE) goal. Although the goal is voluntary, the outreach efforts to provide SBE maximum practicable opportunities are not. The SBE Participation Plan is required prior to commencing work Project design is anticipated to start in December 2023 and be complete by December 2024. Notify Firms Chosen for Interviews August 10, 2023 Consultant Interviews Week of August 21, 2023 Final Selection of Design Firm August 28, 2023 Execution of Consultant Agreement December 2023 The method of Contractor Selection has not been Determined at this time

Design

Roads / Highways

$2,110,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
43
Bidding Soon
707
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

img_map_placeholder

21st St SE & R St SE, Auburn, WA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.