Renovation of a fire / police facility in Portsmouth, New Hampshire. Conceptual plans call for the renovation of a fire / police facility.
Update: https://www.cityofportsmouth.com/sites/default/files/2024-06/CIP-FY25-FY30.FINAL_.FY25.CIP_.Entire%20Document.24.06.27.pdf A 2014 space needs study of the police facility identified deficiencies in the space allocated to the police department, as well as, operational deficiencies in function. In addition, a 2018 public presentation from a public safety architect provided insight into some of the unique needs and requirements of a police facility. Although a funding request for a new facility has been included in the CIP plan since 2015, other citywide projects have had to take precedence. A new police facility is still the goal, and preliminary steps have been taken with monies appropriated for this effort. In the interim, the current facility has needed significant repair and upgrades to make it safe and functional. Although initial projects were identified in FY21, the funding has been used to cover mold and asbestos abatement, and restoration of the areas after the contaminated materials were removed. Luckily, some of the restoration work overlapped with projects originally identified. With the abatement project coming to a close in FY23, the department will resume working on the projects that have been on hold. It should be noted: if the police department moves into a new facility, all the necessary repairs done to the current facility will benefit any city department moving into the space. The remaining projects include: upgrade HVAC filtration in the range, security, ADA compliance, server room upgrade, RDC (redundant/disaster recovery center) upgrade at Fire Station II, dispatch upgrade, updating old lighting throughout the PPD, evidence processing and submittal areas upgrade, renovation of former generator rooms for equipment storage, archive space, and gym area, K9 office conversion, and upgrade back parking lot surface and security fencing. Project is included Portsmouth School Department Fiscal Year 2025-2030 Page No 77 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A 2014 space needs study of the police facility identified deficiencies in space allocated to the police department as well as deficiencies in function. In addition, a 2018 public presentation provided insight into some of the unique needs and requirements of a police facility. Although a funding request for a new facility has been included in the CIP plan since the space needs study was completed, other citywide projects have had to be prioritized. A new police facility is still the goal. Over the years, the current facility has fallen into disrepair, and the space needed for staff and police functions is overcrowded, insufficient, and inefficient. Major overhauls of multiple areas are needed including, but not limited to: security, ADA compliance, IT infrastructure and control room, evidence processing and submittal areas, restructure and renovation of detectives, restructure and renovation of all locker rooms, temperature and humidity control in specified areas, equipment storage, archive space upgrades, additional garage/vehicle evidence bays, upgrades to walls, lighting and flooring-to include asbestos abatement and paint, electrical, and plumbing upgrades. Although space and operational efficiencies will still be a major issue, as defined in the space needs study, this project addresses immediate facility deficiencies until a new police facility is approved. The police were allocated 400K in FY21 and in FY22 to begin addressing these issues. However, due to the mold and asbestos remediation of the police facility and city hall building HVAC issues, including in the police department, the focus on the deficiencies detailed in FY21 and FY22 have only been partially addressed, with most of the projects delayed to FY23. The 400K in FY23 will focus on ADA, IT Control Room, Locker Rooms, security, and storage issues. FY-2023-2028 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Fire / Police
$400,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 2, 2026
To Be Determined, Portsmouth, NH
Related To This Project
Portsmouth, NH
Bid Date: Jul 23 2024
Portsmouth, NH
Bid Date: Aug 08 2024
Portsmouth, NH
Bid Date: Sep 19 2024
Portsmouth, NH
Bid Date: Sep 26 2024
Portsmouth, NH
Bid Date: Sep 27 2024
Portsmouth, NH
Bid Date: Oct 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--