BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Poulsbo, Washington. Conceptual plans call for site work for a bridge / tunnel; and water / sewer project.

This project will reduce flooding, improve water quality and improve fish habitat. The project will replace the existing undersized 24-inch diameter pipe under 8th Ave with a new 12-ft wide concrete box culvert. Initial design has been completed. Final design will be included as part of the state habitat restoration grants. The culvert project is an important component of the South Fork Dogfish Creek Restoration project which is the highest ranked stormwater related habitat restoration project in Kitsap County under the Puget Sound Partnership Near Term Action Plan and as such is positioned as one of the regions top funding priorities. As of July 10, 2024, this project is in the city's 2024-2029 CIP. No further information regarding a design firm or detailed construction timeline has been made available yet, but construction is not anticipated until 2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$625,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
50
Bidding Soon
913
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2030

img_map_placeholder

N 8th Ave, Poulsbo, WA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.