Published August 14, 2024 at 8:00 PM

Updated August 15, 2024

Renovation of a municipal facility in Stony Plain, Alberta. Completed plans call for the renovation of a municipal facility.

1. MECHANICAL SCOPE of work for the Provincial building is as follows: -Replace the existing chiller and rooftop condenser with units of similar capacity. -Refurbish the air handling units (AHU) by replacing supply fans, return fans, dampers, cooling coils, heating coils, humidification grid, and insulation. -Heating piping is to be replaced from the AHU heating coil to the boiler plant. Replace piping, valves, and heating coil pump. -Cooling piping is to be replaced from the AHU cooling coil to the chiller. Piping, valves, and cooling coil pump is to be installed. -Humidification lines are to be replaced from the steam unit to the new humidification grid. -Provide a new hot water to glycol heat exchanger for the heating coil of the AHU, included is to be a circulation pump on the glycol side of the heat exchanger. -Replace all 16 heaters located throughout the Provincial building. -Replace all exhaust fans in the building with like for like units. The scope of work for the Courthouse building is as follows: -Replace the existing chiller and rooftop condenser with units of similar capacity. -Refurbish the air handling units by replacing supply fans, return fans, dampers, cooling coils, heating coils, humidification grid, and insulation. -Heating piping is to be replaced from the AHU heating coil to the boiler plant. Replace piping, valves, and heating coil pump. -Cooling piping is to be replaced from the AHU cooling coil to the chiller. Piping, valves, and cooling coil pump is to be installed. -Humidification lines are to be replaced from the steam unit to the new humidification grid. -Provide a new hot water to glycol heat exchanger for the heating coil of the AHU, included is to be a circulation pump on the glycol side of the heat exchanger. -Replace all 14 heaters located throughout the Courthouse building. -Replace all exhaust fans in the building with consolidated fans. -Replace all Victaulic fittings in the Courthouse building. ELECTRICAL SCOPE of work for both buildings is as follows: -Mechanical equipment feeders to be disconnected and reconnected or demolished. -Replacement and/or installation of breakers, feeders, and conduits to meet code as required. -Installation of new starters as applicable. -Installation of variable frequency drives (VFD) for motors as required. TIMELINE: Stage II ITB to the prequalified firms closed August 13, 2024. Submissions are under review. Construction is expected to begin September 2024. Completion is scheduled for December 31, 2025.

Post-Bid

Municipal

$2,000,000.00

Public - City

Renovation

3

8

4

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
32
Bidding Soon
546
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

September 2, 2024

Project location map

4711 44 St, Stony Plain, AB

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed