BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Monticello, Florida. Working plans call for site work for a water / sewer project.

As per the Owner the project has been rejected. Editorial Content Team is actively seeking updated information. Counties: Jefferson Road Name: Rest Area Limits: 54001000 Project(s): 22266925201(*) Federal Aid No: N/A Total Roadway Length: 2.012 Miles Contract Days: 315 Total Bridge Length: 0.000 Miles Total Proposal Length: 2.012 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 84 Days Other Description: The Improvements under this District Contract consist of upgrading and expanding the SR 8 (I-10) Jefferson County Rest Areas wastewater treatment facility and spray field expansion at Mile Post 18.838 in Jefferson County. Proposed activities include updating equipment at the eastbound rest area and existing spray field, installing a force main along the north side of I-10 to connect to a new spray field expansion area; clearing, grubbing, and constructing a pond on the proposed spray field property; and stabilizing existing dirt roads that access the new spray field property with lime rock. The existing spray field at the EB rest area will remain in service and the newly proposed spray field will supplement. Pre-qualification is Required to Bid on This Project For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 002 Upgrading/expanding Rest Area Wastewater Treatment Facility - SR 8 Proposal Budget Estimate: $5,901,405.00 Contract Days: 315

Final Planning

Water / Sewer

$14,075,049.00

Public - State/Provincial

Site Work

82

3

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
22
Bidding Soon
350
All Active Projects
154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

October 20, 2023

img_map_placeholder

FL-8, Monticello, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.