Renovation of a power facility in Watertown, South Dakota. Working plans call for the renovation of a power facility.

Western Area Power Administration has a requirement for a contractor to provide all labor, materials, equipment, transportation, and other resources to complete the construction of Watertown Substation No. 2, KU1A Tertiary Circuit and Station Service Upgrade in South Dakota. The principal components of the work involve providing miscellaneous sitework, demolition, standard chain link fence, concrete foundations, cable trench, and steel structures; installing Government-Furnished equipment including power circuit breaker, switches, current-limiting reactors, shunt reactors, voltage transformers, power resistors, pad mounted transformers; and providing an automatic transfer switch, a dry-type transformer, miscellaneous electrical, conduit, and grounding. The estimated construction magnitude of this project is between $1,000,000 and $5,000,000. All work is to be completed within 180 days from receipt of Notice to Proceed. All responsible small business concerns may submit a bid which shall be considered by this Agency. This solicitation will be issued on or about July 26, 2023, bid due on or about August 25, 2023, and the projected bid opening date on or about August 28, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Power Plant

$5,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
93
All Active Projects
37
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

img_map_placeholder

To Be Determined, Watertown, SD


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.