BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 7, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Calhoun, Georgia. Working plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

The owner has selected a Design Builder. A timeline for construction has not yet been established. Pedestrian Bridge for Trail at Palmer Memorial Park, Recreational Department City of Calhoun Georgia located at 601 River Street. The project consists of a structure that is similar to the arched pedestrian bridge that is already in place. The dimensions for this pedestrian bridge are as follows; 117 feet from sidewalk/pavement to sidewalk/pavement, 88 feet long (just bridge), and 12 feet wide which the measurement is different from the other pedestrian bridge. Deadline for submission of questions: Thursday, July 27, 2023 Inquiries regarding this request for proposal (RFP) should be made to Margaret Boyd, Director of Purchasing, (706) 602-5680 or e-mail: maboyd@calnet-ga.net Technical questions may be directed to Kim Townsend Director of Recreational Department, 706-602-5950, email; ktownsend @calnet-ga.net.

Pre-Construction/Negotiated

Sidewalks / Parking Lot

$120,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
110
Bidding Soon
2,162
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

January 8, 2024

Project location map

601 S River St, Calhoun, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.