BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Asbestos abatement and renovation of a power facility in Turner Valley, Alberta. Completed plans call for the renovation of a power facility; and for asbestos abatement for a power facility.

The Province requires the services of a contractor with experience in lead-based paint encapsulation and hazardous building material abatement with clear coating products. The proponents should have experience in the application of coatings on pipes, equipment, and metallic building envelopes at industrial sites Work includes - conducting hazardous material abatement procedures on the Sulfur Plant (see project building IDs above) located within the Turner Valley Gas Plant, located in Turner Valley, Alberta. Hazardous materials include asbestos containing materials and lead paint. Work includes abatement on portions of the exterior façade, as well as the interior structure including historic equipment and associated piping housed within. Also included in the scope is repairing holes in the Sulfur Plant roof and walls, and installing polycarbonate windows on the Lean Oil Pumphouse, Scrubber Plant, and Sulfur Plant. Details regarding building observations, conclusions and recommendations including condition and quantity of materials requiring abatement can be found in the Limited Hazardous Materials Condition Assessment (July 4, 2023), attached. Compliance standards for the work including safety and regulatory requirements, removal, encapsulation, and disposal practices are outlined in the Technical Specifications document (2023), attached. Instructions to bidders, contract conditions, and general requirements can also be found in their respective documents, attached. *The Site and building are considered historic, as such care should be taken to leave as much original structure and material as safely possible while completing the abatement. Examples of such efforts include proposed sealants/encapsulants are either transparent or similar to the original colour, and materials used for repairs are compatible with original material. Objective of the program: Have the Sulfur Plant interior conditions acceptable to complete guided tours for the public, and prevent animals and water intrusion from the roof, windows opening, and walls.

Post-Bid

Thermal Power Generation

$100,000.00

Public - State/Provincial

Asbestos Abatement, Renovation

29

8

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
24
Bidding Soon
487
All Active Projects
178
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 10, 2023

September 8, 2023

img_map_placeholder

Sunset Blvd SE, Turner Valley, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.