Site work for a power facility in Groton, South Dakota. Working plans call for site work for a power facility.

Western Area Power Administration has a requirement for a contractor to provide all labor, materials, equipment, transportation, and other resources to complete the construction of Groton Substation, Stage 15 in South Dakota. The principal components of the work involve miscellaneous sitework, foundation demolition, building demolition, earthwork, chain link fence, gravel surfacing, riprap, and seeding; providing concrete foundations; installing Government-Furnished equipment including vertical switchboard sections, station battery system, and station battery chargers; providing, grounding, conduit, cable trench, distribution boards, automatic transfer switch, miscellaneous electrical, and communication facilities; and constructing a site-built control building complete with electrical and mechanical systems. The estimated construction magnitude of this project is between $1,000,000 and $5,000,000. All work is to be completed within 365 days from receipt of Notice to Proceed. All responsible small business concerns may submit a bid which shall be considered by this Agency. This solicitation will be issued on or about July 27, 2023, and the projected bid opening date is August 29, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Power Plant

$5,000,000.00

Public - Federal

Site Work

115

16

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
8
Bidding Soon
171
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2023

September 27, 2023

Project location map

To Be Determined, Groton, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.