Site work for a playground / park / athletic field in Danville, Illinois. Completed plans call for site work for a playground / park / athletic field.

Site Directions: Outdoor tennis courts on south side of Danville Tennis Center at 900 Lincoln Park Avenue, Danville, IL 61832. Outdoor tennis courts on south side of Danville Tennis Center at 900 Lincoln Park Avenue, Danville, IL 61832. DESCRIPTION OF WORK By: City of Danville Description: The work included in this contract consist primarily of the removal and replacement of tennis court pavement, fencing, minor grading and seeding adjacent to the pavement perimeter. COOPERATION WITH UTILITIES AND OTHERS By: City of Danville Description: The Contractor is responsible for verifying the nature and status of all utility relocation work prior to preparation of the Detailed Progress Schedule. The Contractor will take appropriate measures to ensure that construction operations do not interfere with utility facilities and relocation work. The Detailed Progress Schedule will reflect construction sequencing which coordinates with all utility relocation work. The Contractor will be required to adjust the order of its work from time to time, to coordinate same with utility relocation work, and will prepare revised Progress Schedule(s) compliance therewith as directed by the Engineer. The Engineer will be notified in writing by the Contractor at least 48 hours prior to the start of any operation requiring cooperation with others. All other agencies, unless otherwise noted, will be notified in writing by the Contractor ten (10) days prior to the start of any such operation. Where the Contractor is constructing new facilities for a utility, the utility will be notified five (5) days prior to start of this work. The Contractor is responsible for coordinating disconnects and temporary service with the utilities. The following persons have been contacted in reference to utilities they own and operate within the right-of-way limits for this project. All known data from these agencies has been incorporated into the plans. It is, however, the Contractor's responsibility to confirm or establish the existence of all utility facilities and their exact locations, whether contained in the data submitted by these agencies or not, and to safely schedule all utility locations

Award

Playgrounds / Parks / Athletic Fields

$485,510.00

Public - City

Site Work

10

11

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
45
Bidding Soon
612
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2023

September 8, 2023

img_map_placeholder

900 Lincoln Park Ave, Danville, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.