BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Santa Monica, California. Completed plans call for the renovation of a 2,609-square-foot transportation facility.

Mandatory Pre-bid Job Walk: Mandatory Job Walk Project Estimate: $550,000.00 Contract Days: 180 Calendar Days Liquidated Damages:$1,000.00 Requests for clarifications must be entered into ProcureNow thru the Question and Answer tab on or before,Tuesday, February 27, 2024 by 5:00 pm Within ten (10) Days after the issuance of the Notice of Award and prior to commencing Work on the Project, Contractor shall file with City good and sufficient Labor & Material Payment and Performance Bonds each in the amount of 100% of the Contract Sum. The bonds shall be signed by both Contractor and Surety and properly notarized on the City's provided forms or such other forms as required by City. Should any bond required hereunder or any surety on such bond become or be determined by City to be insufficient, it shall be replaced within ten (10) Days by a bond that fully complies with the requirements of Article 11.2 (Bond Requirements) of the City's General Conditions. No further payments to Contractor for Work performed shall be made or due until Contractor has fully complied with all the requirements. Each Bid must be accompanied by a certified or cashier's check made payable to the City of Santa Monica, or a Bidder's bond (using the form provided in the Bid Form) for an amount equal to at least ten percent (10%) of the amount bid as a guarantee that the Bidder will enter into a contract with the City. Bid bonds (or cashier's checks) must be scanned and uploaded into ProcureNow. The City of Santa Monica's Living Wage Ordinance, Santa Monica Municipal Code Chapter 4.65, requires the payment of Minimum Wage for work done on any Contract over a certain threshold to any worker who does not actually work as a manager, supervisor or confidential employee, and who is not required to possess an occupational license. The established Minimum Wage includes an annual adjustment each July 1st by an amount corresponding to the previous calendar year's change in the Consumer Price Index for Urban Wage Earners and Clerical Workers in Los Angeles, Riverside and Orange Counties. The Contractor and Subcontractors shall be licensed in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code of the State of California and submit the number and classification of said licenses with the Bid Documents.

Award

Transportation Terminals

$550,000.00

Public - City

Renovation

77

18

24

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
95
Bidding Soon
2,156
All Active Projects
951
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

img_map_placeholder

3233 Donald Douglas Loop S, Santa Monica, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.