Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 29, 2023 at 8:00 PM
Updated March 13, 2025
Site work for a water / sewer project in Pueblo, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000325299 This project will improve existing channelization of the Arkansas River through this reach by replacing the concrete spillway structure along the northern subchannel on river left with a series of 5 drop structures each separated by a recovery pool. The overflow weir along the main channel on river right will be replaced with a single spillway chute structure. The two channels combine to form a single channel below the spillway and the fifth drop structure of the boater channel, which conveys the total river discharge through a sixth (final) drop structure and recovery pool where it then arrives at the existing river channel. Channel and bank stabilization will be provided via concrete structures, grouted riprap, and loose-placed riprap of varying dimensions. Additional amenities within the of services will include the construction of access trails, assembly and placement of a new pedestrian bridge, and the relocation of an existing wooden pedestrian bridge. Question Acceptance Deadline 08/09/2023 at 2:00 PM MT Questions are submitted online Yes General Requirements - Contractors License Required - FOB Destination - Insurance Required - License Required Each bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid amount. Any bid submitted after the time and date specified will not be considered. Period For Completion: Pueblo Water Will Award the Contract By August 18, 2023. The Completion Of The Total Contract Is Required By June 28th, 2024. Pueblo Water reserves the right to reject any and all bids, or to accept that bid or proposal which in their opinion best serves the interest of Pueblo Water. Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Surety Bond 100 % - Payment Bond 100 %
Bid Results
Water / Sewer
$9,123,781.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 25, 2023
October 25, 2023
Multiple Locations, Pueblo, CO
Related To This Project
Pueblo, CO
Bid Date: Aug 02 2023
Pueblo, CO
Bid Date: Nov 08 2023
Pueblo, CO
Bid Date: Aug 04 2023
Pueblo, CO
Bid Date: Oct 09 2023
Pueblo, CO
Bid Date: Aug 02 2023
Pueblo, CO
Bid Date: Aug 04 2023
Pueblo, CO
Bid Date: Sep 05 2023
Pueblo, CO
Bid Date: Jul 20 2023
Pueblo, CO
Bid Date: Jul 27 2023
Pueblo, CO
Bid Date: Jul 25 2023
Pueblo, CO
Bid Date: Jul 25 2023
Pueblo, CO
Bid Date: Jul 25 2023
Pueblo, CO
Bid Date: Jul 20 2023
Pueblo, CO
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
