BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Pueblo, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000325299 This project will improve existing channelization of the Arkansas River through this reach by replacing the concrete spillway structure along the northern subchannel on river left with a series of 5 drop structures each separated by a recovery pool. The overflow weir along the main channel on river right will be replaced with a single spillway chute structure. The two channels combine to form a single channel below the spillway and the fifth drop structure of the boater channel, which conveys the total river discharge through a sixth (final) drop structure and recovery pool where it then arrives at the existing river channel. Channel and bank stabilization will be provided via concrete structures, grouted riprap, and loose-placed riprap of varying dimensions. Additional amenities within the of services will include the construction of access trails, assembly and placement of a new pedestrian bridge, and the relocation of an existing wooden pedestrian bridge. Question Acceptance Deadline 08/09/2023 at 2:00 PM MT Questions are submitted online Yes General Requirements - Contractors License Required - FOB Destination - Insurance Required - License Required Each bid must be accompanied by a certified check or bid bond in the amount of ten percent (10%) of the bid amount. Any bid submitted after the time and date specified will not be considered. Period For Completion: Pueblo Water Will Award the Contract By August 18, 2023. The Completion Of The Total Contract Is Required By June 28th, 2024. Pueblo Water reserves the right to reject any and all bids, or to accept that bid or proposal which in their opinion best serves the interest of Pueblo Water. Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Surety Bond 100 % - Payment Bond 100 %

Bid Results

Water / Sewer

$9,123,781.00

Public - City

Site Work

66

10

56

7

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
9
Bidding Soon
205
All Active Projects
87
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

October 25, 2023

img_map_placeholder

Multiple Locations, Pueblo, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.