Demolition, site work, new construction, renovation and addition to a transportation facility in South Burlington, Vermont. Completed plans call for the addition of a 36,000-square-foot, three-story above grade transportation facility; for the demolition of a transportation facility; for the construction of a 36,000-square-foot, three-story above grade transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.

The project consists of an expansion of the existing North terminal at Patrick Leahy Burlington International Airport, demolition of a portion of the existing terminal, utility construction, utility and generator relocation, new aircraft apron construction, new passenger boarding bridges, and interior renovation of a portion of existing 2nd floor concourse level. Sub Bid Divisions: GC The total estimated finished floor area of the expansion is 36,000 square feet. An unfinished lower level of approximately 28,500 square feet is also part of the building. A preliminary design has been completed and is presented in the Bid Documents. The project also includes the construction of approximately 4,400 linear feet of recreational path, landscaping, and hardscape features on Airport-owned property in the adjacent Chamberlain neighborhood Technical questions during the bid period shall be directed to Stu Moncrieff at Jacobs (Phone: 603-496-9267, e-mail: stu.moncrieff@jacobs.com). Question Deadline 08/04/2023 at 12:00 PM ET ALL QUESTIONS VIA EMAIL TO STU.MONCRIEFF@JACOBS.COM WITH READ RECEIPT. RESPONSES WILL BE ISSUED BY ADDENDUM TO ALL REGISTERED PLAN HOLDERS. DEADLINE FOR QUESTIONS OF 5 DAYS PRIOR TO BID DEADLINE. CM at Risk: Project will be delivered using CM at Risk. Allowable under FAA funding. CM to assist with cost estimating, design review, constructability, lead time, etc. to best fit the project within available funding. GMP to be negotiated after 80% design development. GMP negotiation to include final Division 01 specifications. Building: Construction of ~36,000 SF new finished terminal space (~28,500 SF footprint). o Apron level: ~28,500 SF unfinished space (mechanical/electrical/sprinkler rooms). o Concourse level: ~28,500 SF finished space (circulation, holdroom, restrooms). o 3rd level: ~7,500 SF finished space (Airport office, restrooms, observation space. o 3rd level: Outdoor/rooftop space for public (non-ticketed passenger) use. New passenger boarding bridges (PBBs) (up to 4 new PBBs anticipated). Demolition/renovation of existing concourse level for improved circulation and future holdroom space. Scope of building work subject to change to align with project funding. Site: Pavement removal. Building demolition (approx. 4,250 SF). PBB demolition/disposal/relocation. Backup generator and utility relocation. Installation of new site utilities and drainage. Apron expansion (approx. 1,500 SY) Pavement restoration (select material and new bituminous pavement). Minor fencing work. Scope of site work subject to change to align with available funding. Off-site (Landscape mitigation): Construction of ~4,400 LF recreational path in adjacent Chamberlain neighborhood. Path width and surface type TBD. Five (5) street crossings. Landscaping and hardscape features. All on property owned by the Airport. Scope of landscape mitigation subject to change based on value of Terminal improvements. Safety: Draft Construction Safety and Phasing Plan (CSPP) drawings have been developed. CM will provide input on phasing and work areas prior to submittal to FAA for approval. Permits (by Jacobs and subconsultants): Vermont ANR (Act 250, Stormwater). South Burlington Site Plan Approval.

Post-Bid

Transportation Terminals

$35,000,000.00

Public - City

Addition, Demolition, New Construction, Renovation, Site Work

205

15

12

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
77
Bidding Soon
1,237
All Active Projects
507
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2023

April 15, 2024

img_map_placeholder

1200 Airport Dr, South Burlington, VT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.