Site work for a bridge / tunnel in South Burlington, Vermont. Completed plans call for site work for a bridge / tunnel.

Question Deadline 06/28/2024 at 5:00 PM ET During the advertisement phase of this project all questions shall be addressed solely to the MPM. . Questions received after this time may not be answered. Any revisions, addendums and answers to questions received by the due date for questions will be sent to bidders who received this Invitation via email. In addition, revisions will be posted on the City's RFP web page http://burlingtonvt.gov/RFP/. On Queen City Park Road where it crosses over the Vermont Railways, Inc. (VTR) tracks and on VT Route 127 (the "Beltline") where it crosses over the New England Central Railroad tracks within the City of Burlington, Vermont. This contract is subject to the Burlington Pre-Qualification of Construction Contractors, the Burlington Livable Wage Ordinance, the Burlington Union Deterrence Ordinance, and the Burlington Outsourcing Ordinance. No bid will be accepted without signed certificates of compliance with listed ordinances and a filled out Pre-Qualification of Construction Contractors Application. The Contractor is hereby notified that approval of the Right-of-Entry to NECR's right-of-way on VT Route 127 is currently pending. It is expected that the Right-of-Entry will be approved by August, 2024 and the project will be built as shown in the Contract. If the issuance of the Right-of-Entry permit requires work to be added to the Contract, the work will be reimbursed to the Contractor as Extra Work per Subsection 109.06 Each BID must be accompanied by a certified check payable to the City of Burlington for five percent (5%) of the total amount of the BID. A BID bond may be used in lieu of a certified check. APPROXIMATELY 0.5 MILES WEST OF THE INTERSECTION OF VT RTE. 7 (SHELBURNE ROAD) AND QUEEN CITY PARK ROAD OVER THE VERMONT RAILWAY. THIS PROJECT INVOLVES CONCRETE PATCHING IN AREAS OF THE EXISTING BRIDGE DECK AND RELATED RAILING WORK The scope of the work consists of removing and replacing portions of the QCPR bridge rail, all the QCPR approach rail, and modifications to the QCPR crash rail. Along with the removal and replacement of the VT Route 127 bridge and approach rail including the bridge rail posts.

Award

Bridges / Tunnels

$456,789.00

Public - City

Site Work

19

5

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
77
Bidding Soon
1,237
All Active Projects
507
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2024

August 19, 2024

img_map_placeholder

Multiple Locations, South Burlington, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.