BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2023 at 8:00 PM

Updated March 27, 2024

Site work and paving for a road / highway in Hayward, Wisconsin. Working plans call for site work for a road / highway; and for paving for a road / highway.

Bid is cancelled CNF Black Lake Campground Paving and Campground improvements QUESTIONS due in writing NLT 8/11/2023 C.1 OF CONTRACT Provide equipment, supplies and personnel to perform project as identified in specs, and drawings. C.2 PROJECT From The Great Divide Ranger District Office, Travel From Hayward, Head South On Main St Toward 5th St And Turn Right, Turn Left On Dakota Ave. And Continue Onto State Highway 27 For 0.9 Mile, Turn Left (East) On County Highway B 25 Miles To The Intersection With Highway W. Turn Left (North) Onto W. Barker Lake Road And Drive 4.8 Miles To Intersection With Black Lake Road (FR 174), Continue North On FR 174 For 1.3 Miles And Stay Right On Black Lake Rd. (FR 172) For 2 Miles. Turn Left (North) Onto N. Black Lake Rd (FR 173). Go 0.5 Miles And Turn Right (East) On The Paved Campground Road (FR 1666), Loretta, Wi 54896. Latitude 45.980867 And Longitude -90.942928. C.3 OF CONSTRUCTION PROJECT Between $250,000 and $500,000 C.4 TECHNICAL SPECIFICATIONS Documents attached and identified in Section J of this solicitation. 452.211-72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J. 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract. Period of : 09/06/2023 to 06/28/2024 *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Roads / Highways

$500,000.00

Public - Federal

Paving, Site Work

42

15

15

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
0
Bidding Soon
211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

September 23, 2023

Project location map

10050 Nyman Ave, Hayward, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.