BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a mixed-use development in Ione, California. Completed plans call for site work for a educational facility; for outdoor lighting for a educational facility; sidewalk / parking lot; and sidewalk / parking lot.

The Department of Forestry and Fire Protection (CAL FIRE) is seeking services to Install Landscape and Pathway Lightings, to the department's CAL FIRE Training Center (CFTC) located at 4501 Highway 104, Ione, CA 95640 Contactor shall provide all transportation, materials, labor, equipment, tools, permits, taxes, and fees to install landscape and pathway lightings, which are provided by CAL FIRE Training Center (CFTC). The DVBE Participation Program applies, and a three percent (3%) goal is required for this IFB. As required by Executive Order S-02-06, the California Department of Forestry and Fire Protection (CAL FIRE) is committed to meeting the State's 25 percent (25%) Small Business (SB) participation goal. Written Question Submittal July 28, 2023 Payment Bond Requirement: If the total contract price exceeds $25,000.00, Contractor shall furnish a Payment Bond for not less than one hundred percent (100%) of the total amount payable by the terms of this Agreement. T Contractor agrees to provide to the California Department of Forestry and Fire Protection (CAL FIRE) Landscape and Pathway Lighting, as described herein: Contractor shall provide all transportation, materials, labor, equipment, tools, permits, taxes, and fees to install landscape and pathway lightings, which are provided by CAL FIRE Training Center (CFTC). 2. The Agreement may be amended to increase services at the rate(s) specified in Attachment 1, Rate Sheet. 3. The services shall be performed at CAL FIRE CFTC: 4501 Highway 104, Ione, CA 95640 4. Any reference to CAL FIRE Project Representative shall also include their designee. 5. This Agreement will commence on August 01, 2023 (est), or upon approval by CAL FIRE, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by CAL FIRE. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by CAL FIRE Project Representative. This Agreement shall expire on October 31, 2023 (est). The services shall be provided during normal working hours, Monday through Friday, 7:00 a.m. to 5:00 p.m., except State holidays. The parties may amend this Agreement as permitted by law

Bid Results

Educational

$70,399.00

Public - State/Provincial

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
78
Bidding Soon
1,646
All Active Projects
663
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.