BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 25, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Christmas Valley, Oregon. Completed plans call for site work for a water / sewer project.

The First-Tier Subcontractor Disclosure Form, which can be submitted separately, is required at 5:00 PM on August 9, 2023. Generally, the work consists of furnishing and installing a complete advanced metering infrastructure (AMI) cellular-based automated meter reading system, including water service meters and electronic display registers, meter interface units, AMI modules and data collectors, meter installation and data collection hardware and software, and associated equipment accompanied by the bid bond or a certified check executed in favor of the owner in an amount not less than 5% of the total amount of the bid. Bid bond or check will be forfeited should the selected bidder neglect or refuse to enter into contract and provide suitable bond for faithful performance of the work. The successful bidder shall provide a performance bond, as hereinafter stipulated, for the full amount of the contract within 10 days after awarding of the contract, i.e. contract date. All questions must be submitted to Darryl Anderson, Anderson Engineering & Surveying, Inc., 541-947-4407, darryla@andersonengineering.com. The owner reserves the right to reject any or all bids not in compliance with all prescribed bidding procedures and requirements and other applicable laws, and the owner may reject for good cause any or all bids upon the owner finding that it is in the public interest to do so. A Pre-Bid Meeting will not be held for this project. All questions must be submitted to Darryl Anderson, Anderson Engineering & Surveying, Inc., 541-947-4407, darryla@andersonengineering.com Custom Bid Results OPTION #1 - CELLULAR BASED METERING GILBERT & SONS - $512,707.02 OPTION #2 - RADIO BASED METERING GILBERT & SONS - $499,987.02

Award

Water / Sewer

$499,987.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
6
Bidding Soon
106
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

October 5, 2023

Project location map

To Be Determined, Christmas Valley, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.