BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Milledgeville, Georgia. Working plans call for the renovation of a 39,000-square-foot educational facility.

The 2021 delivery of the 43,000 gross square feet (GSF) Integrated Science Complex provided a variety of new natural science research labs, instructional labs and related core service spaces that allowed the partial relocation of functions and uses from the four story, 79,000 GSF Herty Hall, originally constructed in 1954 with subsequent additions and minor renovations in 1971 and 2009. Since most of Herty's lab spaces have had no significant renovation, they lack the flexible configuration required to support modern teaching pedagogy and have casework and utility services requiring renewal and upgrade. The building also has no modern faculty and student collaboration spaces and lacks adequate circulation and building support space. This project will include the renovation and/or reconfiguration of approximately 39,000 GSF (approximately 50%) of existing space on portions of all four floors. The scope is anticipated to include a combination of general space reconfiguration and specialized lab configurations, including complete renovation of the Organic Chemistry lab and chemical stock room. The project will also provide a commons and circulation space appropriate to the size and density of the building, relocate the existing poorly configured accessible main floor entrance, create new code-compliant rest rooms, and renew other selected building systems. The project is intended to create quality space to support undergraduate natural science instruction, as well as provide needed space to enhance instruction in nursing and health sciences programs. This project will include the renovation and/or reconfiguration of approximately 39,000 GSF (approximately 50%) of existing space on portions of all four floors. The scope is anticipated to include a combination of general space reconfiguration and specialized lab configurations, including complete renovation of the Organic Chemistry lab and chemical stock room. The project will also provide a commons and circulation space appropriate to the size and density of the building, relocate the existing poorly configured accessible main floor entrance, create new code-compliant rest rooms, and renew other selected building systems. The project is intended to create quality space to support undergraduate natural science instruction as well as provide needed space to enhance instruction in nursing and health sciences programs. Question Deadline 08/09/2023 at 2:00 PM Deadline for written questions Wednesday, September 6th, 2023 2:00 PM Kelsey Ayers Contracts Administrator e-mail: Kelsey.ayers@gsfic.ga.gov 404-270-0207

Pre-Construction/Negotiated

Educational

$14,200,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
47
Bidding Soon
1,158
All Active Projects
443
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2023

December 2, 2024

img_map_placeholder

135 N Wilkinson St, Milledgeville, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.