BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Milliken, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Contractor will furnish all tools, equipment, machinery, materials, supplies, superintendence, insurance, transportation, other construction accessories, and services specified or required to be incorporated in and form a permanent part of the construction and completion of the work proposed to be done under this Construction Agreement as described in detail in the Contract Documents (Work or Scope of Work). In addition, the Contractor shall provide and perform all necessary labor in a first-class and workmanlike manner and in accordance with the conditions and prices stated in the Contract Documents. The Contractor shall further perform, execute, construct, and complete all things mentioned to be done by the Contractor and all work covered by the Owners official award of this Construction Agreement to the Contractor, such award being based on the acceptance by the Owner of the Contractors bid, or part thereof. The Contractor warrants that it will ensure that all lower tier contractors and material suppliers, including without limitation subcontractors and sub-subcontractors, will be obligated to comply with the terms of this Construction Agreement as it relates to their own contractual obligations. Please direct questions on bidding procedures and technical questions about the project work to Jon Rabas, Streets Director, at JRabas@millikenco.gov. Reference Number 0000325632 Source ID PU.AG.USA.2433.C2681226 Piggyback Contract No Question Acceptance Deadline 08/07/2023 07:00 PM EDT Questions are submitted online No Project #1 (CR 19) - Consists of a two-inch mill & overlay of CR 19 from CR 42 to 18986 CR 19. Improvements consist of 14,003 SY asphalt cold mill, 1,513 tons of asphalt hot mix asphalt, and 18,758 LF of pavement markings. Project #2 (N. Quentine Ave.) - Consists of a two-inch mill & overlay of N. Quentine Ave. from SH 60 to Broad St. Improvements consist of 3,000 SY asphalt cold mill, 340 tons of asphalt hot mix asphalt, and 1,520 LF of pavement markings. Project #3 (Inez Blvd.) - Consists of a two-inch mill & overlay of Inez Blvd from Quentine Ave. to Dove Valley Ave. Improvements consist of 254 SY asphalt cold mill, 29 tons of asphalt hot mix asphalt, and 95 LF of pavement markings. Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 5 %

Bid Results

Roads / Highways

$324,036.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
43
Bidding Soon
933
All Active Projects
406
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2023

September 13, 2023

img_map_placeholder

Multiple Locations, Milliken, CO

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.