Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published August 9, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Boulder City, Nevada. Conceptual plans call for site work for a water / sewer project.
The Authority is seeking professional engineering services to perform assessment, analysis, preliminary and final design, and design services during construction for components of the flocculation process at the Alfred Merritt Smith Water Treatment Facility (AMSWTF). Many of the mechanical and electrical components of the process are nearing the end of their useful life. There is little to no support available from some of the original manufacturers. Electrical equipment is now obsolete and unsupported. There are also opportunities for improvements in the controls and communication infrastructure in the area. The flocculation process at AMSWTF consists of an aeration channel, two mixing channels where ferric chloride, fluorosilicic acid, and a cationic polymer are added to the water, a flow splitter, and 10 flocculation basins, each divided into four stages. The basins discharge into a common channel that feeds downstream filters. Each mixing chamber contains two flash mixers and two rapid mixers. Weir slide gates control flow into the flow splitter and into each individual basin. Each flocculation basin stage has three separate channels, each channel with a single dual-impeller, low-speed agitator. Slide gates are used to control flow into the flocculation effluent channel. Two large rectangular butterfly valves control flow from the aeration channel into the mixing channels.
Conceptual
Water / Sewer
$500,000.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2024
243 Lakeshore Rd, Boulder City, NV
Related To This Project
Boulder City, NV
Bid Date: Aug 10 2023
Boulder City, NV
Bid Date: Aug 24 2023
Boulder City, NV
Bid Date: Aug 31 2023
Boulder City, NV
Bid Date: Aug 29 2023
Boulder City, NV
Bid Date: Sep 20 2023
Boulder City, NV
Bid Date: Sep 14 2023
Boulder City, NV
Bid Date: Dec 16 2021
Boulder City, NV
Bid Date: Dec 30 2021
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed