Published July 24, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Edmonton, Alberta. Contact the soliciting agency for additional information.

Reference Number AB-2023-04765 The Sheerness-Blowdown Canal was built in 1983-84 by Alberta Environment. This canal accepts the water discharge from the Sheerness-Blowdown Power Plant cooling pond. This water is used for irrigation and stock water replenishment downstream before terminating into Carolside reservoir. Sheerness-Blowdown Canal has 22.2 km of concrete lined canal, 1.6 km of cobble armoured canal and 4.0 km of natural channel above Carolside Dam. The concrete-lined canal has experienced many problems including failure and loss of bitumen joint sealant, (Photo 2.1.1) concrete spalling and cracking, exposure of the welded wire reinforcement and displacement of concrete panels. The bed of the natural channel downstream in the canal has degraded and the channel banks have eroded. The drop structures show some signs of scour. The inlet of Sheerness-Blowdown Canal is located approximately 25km south of Hanna on the west side of Highway 36. It crosses Highway 36 before turning east and ultimately terminates upstream of the Carolside Dam. Sheerness-Blowdown Canal has 19 road crossings, 6 drop structures, 15 turnout structures, 4 cross drains, one drain inlet and a Parshall flume. Alberta Agriculture and Irrigation requires the services of an Engineering Consultant to undertake a comprehensive assessment of Sheerness-Blowdown Canal. The services to be provided shall include: 1. Review previous studies, information, drawings, and technical reports including construction records, previous geotechnical investigations, structural design and structural assessments of the infrastructure. 2. Conduct a site inspection, as necessary, to become familiar with and assess the current canal condition. 3. Provide an assessment of the remaining service life of the culverts crossings indicated in Figure 3.1. Provide recommendations for the possible replacement or rehabilitation of the three culvert crossings. 4. Assess the structural condition and integrity of the Sheerness-Blowdown Canal structure and all associated structures. Also assess the risks and their consequence of the continued deterioration of the canal and structures and the anticipated further rate of deterioration.

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
26
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2024

Project location map

Multiple Locations, Edmonton, AB

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed