Site work, paving and new construction of a water / sewer project in Groves, Texas. Completed plans call civil work for a wastewater treatment plant.

A. New Precast Chlorination/Chemical Building: Provide a new complete 24 x 30 x 12 precast concrete building, including reinforced concrete slab, foundation, remove eighteen inches and replace with compacted select fill, building, crane, doors, windows, HVAC equipment, pavement modifications, sidewalks, plumbing, piping, fixtures, electrical, connection to existing, and appurtenances. B. Reinforced Concrete Road: Furnish and install a 7 reinforced concrete road with 8 limestone subgrade, including demolition and removal of existing asphalt road, subgrade preparation, reinforced concrete, rebar, saw cutting, joints, connections to asphalt pavement and connections to limestone roadway. C. Raise Elevation of New Chlorination/Chemical Building: Furnish all labor, materials, tools, equipment, supervision, necessary to raise the proposed chlorination/chemical building by 1 of fill, including fill material, surface clearance, fill compaction and levelling. D. ALTERNATE BID - New CMU Chlorination/Chemical Building: Provide a new complete CMU building, including reinforced concrete slab, foundation, remove eighteen inches and replace with compacted select fill, building, crane, doors, windows, HVAC equipment, pavement modifications, sidewalks, plumbing, piping, fixtures, electrical, connection to existing, and appurtenances. The successful bidder must furnish Performance Bond and Payment Bond on the forms provided in the amount of one hundred percent (100%) of the total contract price from a Surety or other Sureties acceptable to the Owner Contract Times: Days The Work will be substantially completed within 270 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 300 calendar days after the date when the Contract Times commence to run.

Bid Results

Water / Sewer

$349,533.00

Public - City

New Construction, Paving, Site Work

28

12

2

7

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
69
Bidding Soon
547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2023

September 14, 2023

Project location map

6499 Georgia St, Groves, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.