BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a water / sewer project in Groves, Texas. Completed plans call civil work for a wastewater treatment plant.

A. New Precast Chlorination/Chemical Building: Provide a new complete 24 x 30 x 12 precast concrete building, including reinforced concrete slab, foundation, remove eighteen inches and replace with compacted select fill, building, crane, doors, windows, HVAC equipment, pavement modifications, sidewalks, plumbing, piping, fixtures, electrical, connection to existing, and appurtenances. B. Reinforced Concrete Road: Furnish and install a 7 reinforced concrete road with 8 limestone subgrade, including demolition and removal of existing asphalt road, subgrade preparation, reinforced concrete, rebar, saw cutting, joints, connections to asphalt pavement and connections to limestone roadway. C. Raise Elevation of New Chlorination/Chemical Building: Furnish all labor, materials, tools, equipment, supervision, necessary to raise the proposed chlorination/chemical building by 1 of fill, including fill material, surface clearance, fill compaction and levelling. D. ALTERNATE BID - New CMU Chlorination/Chemical Building: Provide a new complete CMU building, including reinforced concrete slab, foundation, remove eighteen inches and replace with compacted select fill, building, crane, doors, windows, HVAC equipment, pavement modifications, sidewalks, plumbing, piping, fixtures, electrical, connection to existing, and appurtenances. The successful bidder must furnish Performance Bond and Payment Bond on the forms provided in the amount of one hundred percent (100%) of the total contract price from a Surety or other Sureties acceptable to the Owner Contract Times: Days The Work will be substantially completed within 270 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 300 calendar days after the date when the Contract Times commence to run.

Bid Results

Water / Sewer

$349,533.00

Public - City

New Construction, Paving, Site Work

28

12

2

7

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
82
Bidding Soon
1,188
All Active Projects
465
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 15, 2023

September 14, 2023

July 10, 2024

img_map_placeholder

6499 Georgia St, Groves, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.