Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Barnstable, Massachusetts. Completed plans call for site work for a water / sewer project.

Questions Due Date: Aug 4th 2023, 12:00 PM EDT Project Description: Furnishing all labor, materials, & equipment necessary to install sewer lateral riser connection pipes as specified. The Town of Barnstable Department of Public Works (the Town) intends to build vertical extensions onto existing service laterals in roads listed below. The existing services end at the edge of the Town right of way. Refer to Attachment B for exact locations. B. Work Included: The work to be performed under this Contract includes but is not limited to installation of sewer lateral riser connection pipes, excavation, backfill, removal and replacement of pavement and/or concrete, site restoration and appurtenant work. Up to 163 6-inch diameter vertical riser extensions of varying depth are to be installed. A list of exact property location and approximate depths is provided in Appendix B. C. Schedule Limitations: 1. The gravity sewer riser installation will not begin before September 5 and shall and be ready to accept abutter connections on or before January 31, 2024.

Award

Water / Sewer

$784,393.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
602
Active Projects
325
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2023

September 15, 2023

Project location map

Strawberry Hill Rd, Barnstable, MA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed