Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Bartlett, Illinois. Working plans call for site work for a bridge / tunnel.
NOTICE TO INTERESTED FIRMS: Notice is hereby given that The Village of Bartlett, Cook, Du Page and Kane Counties, IL. will be accepting electronic submissions of Statements of Interest (SOI) until 5:00 P.M. on Friday August 4th, 2023, at which time SOI's will no longer be accepted and the review process will begin. PROJECT NEED: The Village of Bartlett has secured funding for bridge improvements to Schick Road over the West Branch of The DuPage River. The project is to replace the existing structure and other appurtenances necessary for appropriate construction. The Village of Bartlett is seeking Phase 1 Preliminary Engineering, Phase 2 Design and Phase 3 Construction Engineering services for support during construction. Phase 2 and Phase 3 are contingent upon successful completion of the prior phases. The Schick Road - West Branch bridge will be completely reconstructed with this project. SUBMISSION INSTRUCTIONS: Interested firms should electronically submit their Statement of Interest to Bob Allen, Village Engineer (rallen@bartlettil.gov) AND Nick Talarico, Civil Engineer (ntalarico@bartlettil.gov), before 5:00 P.M. on Friday, August 4th, 2023. See the full "SOI Request" for additional information. The Village of Bartlett is seeking Letters of Interest and Statement of Qualifications from prequalified design firms for the State of Illinois to provide preliminary, design and construction engineering services. Project Need - The Village of Bartlett has secured funding for bridge improvements to Schick Road over the West Branch of The DuPage River. The project is to replace the existing structures and other appurtenances necessary for appropriate construction. The Village of Bartlett is seeking Phase I preliminary engineering, Phase II design and Phase III construction engineering services for support during construction. Phases II and III are contingent upon successful completion of the prior phases. Project Components - The Schick Road bridge will be completely reconstructed with this project. The project shall consist of, but not limited to, the following aspects: existing bridge removal, bridge reconstruction, approach pavement removal and replacement, soil erosion and sediment control implementations, minor public utility improvements, pavement marking, and signage. Timeline - Phase I funding is available in the IL FY 2024 Program, 7/1/23 - 6/30/24. Phase II and III funding contingent upon availability in future years. Expected Problems - The following are issues that could be a concern during the construction: o West Branch of The DuPage River Flood Stage. o School Traffic and Pedestrian Management. o Nearby resident and satisfaction is an important factor for the Village. Project Budget - The estimated total budget for the project is approximately $4.1 million (engineering and construction). Selection Criteria - Proposals will be evaluated in accordance with the Village of Bartlett QBS Policy and Procedures. Criteria for selection for this project is as follows: o Technical Approach (20%) o Firm Experience (20%) o Specialized Expertise (10%) o Staff Capabilities (Prime/Sub) (20%) o Past Performance on Similar Projects (30%) Selection - Depending on the proposals received, the Village of Bartlett may select based on the written submittal or require interviews. Once a firm is selected, the Village of Bartlett will enter into contract negotiations with the top ranked firm. If an agreement cannot be reached with the top ranked firm, the Village of Bartlett will start negotiations with the next highest ranked firm.
Final Planning
Bridges / Tunnels
$4,100,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2024
W Schick Rd, Bartlett, IL
Related To This Project
Bartlett, IL
Bid Date: Apr 22 2020
Bartlett, IL
Bid Date: Feb 03 2021
Bartlett, IL
Bid Date: Aug 28 2023
Bartlett, IL
Bid Date: Sep 21 2023
Bartlett, IL
Bid Date: Sep 07 2023
Bartlett, IL
Bid Date: Feb 14 2022
Bartlett, IL
Bid Date: Dec 22 2021
Bartlett, IL
Bid Date: Aug 04 2021
Bartlett, IL
Bid Date: Jul 05 2023
Bartlett, IL
Bid Date: Jun 21 2023
Bartlett, IL
Bid Date: May 24 2023
Bartlett, IL
Bid Date: May 11 2023
Bartlett, IL
Bid Date: Jun 05 2023
Bartlett, IL
Bid Date: Jun 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.