Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated August 29, 2026

Site work and paving for a civil project in Robb, Alberta. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

BF01845 Carrying Hwy 795 Over Bigstone Creek (near Falun) - culvert replacement (Construction WAC0010087); and BF01709 Carrying Hwy 42 Over Tributary to Piper Creek - culvert replacement (Construction WAC0008849). TIMELINE: Projects are in various stages of design. Construction of BF is 01845 tentatively planned for 2029; and BF 01709 in 2030. Further update may be available spring 2027. *Budget is unreleased.

Design

Bridges / Tunnels

$8,700,000.00

Public - State/Provincial

Paving, Site Work

4

8

3

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
22
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed