BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Stillwater, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The purpose of the Request for Proposal is to provide final design engineering for proposed improvements to CSAH 5 between TH 36 and - 200' North of Autumn Way. This project will include: 2" Mill and Bituminous Overlay Bituminous Trail Reconstruction ADA Pedestrian Ramps Curb and Gutter Removal and Replacement Traffic Control Sign Replacement Pavement Striping A full topographic survey of the project corridor has been complete and will be provided to selected consultant. Scope of Work and Deliverables All aspects of the scope of services outlined below and included herein are expected to be completed within the project deadlines. All reports/documentation must be developed and presented in Microsoft Office and all design files must be developed and presented in Microstation adhering to Washington County approved formats unless otherwise noted or requested by the Consultant with approval of the County. . Project Management Project management and administration including monthly invoicing, schedule updating and communication with the necessary project personnel. The Project manager and lead designer should plan to meet with the County for one kick off virtual PMT meeting. Project Manager should then plan Bi-weekly 30-minute progress meetings with County staff and one 60% plan review meeting. 2.1.2. Utility Coordination For the purposes of this RFP, "utilities" shall mean and include, but not be limited to, all privately, publicly, or cooperatively owned pipes, lines, antennas, or facilities for the distribution or transmission of electrical energy, gasoline, oil, natural gas, water, sewage, steam, cable TV, telephone or other material and communication lines and devices. A gopher state one locate has been obtained by the County for the project corridor. The consultant shall review the mapping and determine areas of conflict. All communications with utility owners along with utility owner coordination meetings will be handled by the County. All utilities located shall be shown on plans in accordance with the requirements of the "utility Notifications Law", Minnesota Statute Section 216D.04. 2.1.3. QA/QC Provide quality assurance and quality control checks of the compiled 60%, 90% and final plan set. Question Deadline 08/04/2023 at 4:00 PM CT Final Plan Submission February 2024. Project Kick Off September 6, 2023 60% Plan Submission November 2023 2 Week County Review November 2023 90% Plan Submission January 2024 2 Week County Review January 2024 Final Plan Submission February 2024 Construction Spring/Summer 2024 The County reserves the right to waive any minor irregularities in the proposal request process. The County reserves the right to interview any, all, or none of the respondents at its discretion. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$2,364,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
68
Bidding Soon
1,771
All Active Projects
609
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 19, 2024

img_map_placeholder

County Rd 5, Stillwater, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.