BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2023 at 8:00 PM

Updated February 20, 2024

Site work and paving for a road / highway in Stillwater, Minnesota. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of 8/25/2023 this project was cancelled. No additional information is available at this time. Accepting sealed bids for the CR-74 Multi-Use Trail Project, including grading, trail construction, fire hydrant, curb and gutter replacement, signing, and striping. Washington County hereby notifies all bidders that it does not discriminate on the basis of race, color, national origin, sex, religion, age and handicapped status in employment or the provision of services in consideration for an award. The Washington County Board of Commissioners reserves the right to reject any or all bids and waive any defects therein. Project has been cancelled.

Final Planning

Roads / Highways

$500,000.00

Public - County

Paving, Site Work

63

10

10

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
130
Bidding Soon
1,621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2023

September 29, 2023

Project location map

Multiple Locations, Stillwater, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.