BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a mixed-use development in Midway, Texas. Working plans call for the construction of a water / sewer project; for site work for a water / sewer project; and detention facility.

August 8, 2023 3:00 p.m. Last Day to Submit Written Questions for Clarification to the Department The Texas Department of Criminal Justice (TDCJ) is inviting bids to Construct Water Tanks and Plant at the Ferguson Unit in Midway, Texas. This project consists of the construction of two (2) new 150,000-gallon potable water storage tanks and one (1) new water plant. Work includes new foundations, cathodic protection, all new piping, and valves. Construct a new 1.5 MGD potable water plant, a gas separator, chlorination equipment, service pumps, new slab on grade for service pumps, new SCADA system for all new and existing equipment (wells, service pumps and tank level indicators), new pipes and valves, as-builts and O&Ms, drive in site development with lighting, security fencing & signage, new electrical service, demo existing water system upon completion of new system. All work shall be performed as shown in the construction plans prepared by Jacobs Engineering Group. Construct two (2) new 150,000-gallon potable water storage tanks and one (1) new 1.5 MGD potable water plant. To include new foundations, cathodic protection, all new piping and valves per engineer specifications. Contractor must provide evidence that demonstrates the contractor is qualified to satisfactorily perform the specified work and must have worked in this trade for at least five (5) years. The contractor shall submit written evidence to include a minimum of three (3) projects completed within the last ten (10) years of similar work, size and complexity to include the owner's name, telephone number, location, type of facility, construction cost and the date of completion with all bid proposals. Contractor must be bondable and insurable at the levels required. All bid proposals must be accompanied by a Bid Deposit in the amount of 5% of greatest amount bid. Performance and Payment Bonds in the amount of 100% of the contract amount will be required upon award of a contract. The TDCJ reserves the right to reject any or all bids, and to waive any informality or irregularity.

Final Planning

Jails / Prisons

$8,756,600.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
27
Bidding Soon
844
All Active Projects
339
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2023

April 14, 2025

img_map_placeholder

12120 Savage Dr, Midway, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.