BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2024 at 7:00 PM

Updated April 6, 2024

Site work and paving for a mixed-use development in Kirkland, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

108th Ave. NE Transit Queue Jumps Phase 1 & 2 Project Description The project includes the design and construction for the 108th Avenue NE northbound Transit Queue Jumps from north of NE 62nd Street to north of NE 68th Street (Phase 1) and from north of 53rd Street to north of NE 60th Street (phase 2). This Request for Qualification (RFQ) is to solicit 30% design of the project. Upon completion of consultant services for design and PS&E preparation, the contract may be supplemented for final design and construction engineering services, at the discretion of the City. The project includes widening the roadway, adding northbound bus lane, replacing bicycle lane and sidewalk within project alignment. A typical modified road section includes 11' bus lane, 4' planter, 5' replaced bike lane, 1' tactile strip and 5' sidewalk, supported by retaining walls. To accommodate the new transit lane, existing traffic signal system will be modified at NE 68th St & 108th Ave NE and NE 60th St & 108th Ave NE, underground utility lids and catch basins will be adjusted as needed within the project area, new LID storm water system improvements are expected to meet permitting requirements, and overhead power and communication line relocation is expected to accomplish project scope. The project is funded by a combination of local funds, state grant and federal funding for a total of $3,500,000.00. Inclusion of federal funding will require the successful firm to adhere to design and documentation requirements consistent with the funding source, including Federal EEO requirements. Prospective consultants shall have all administrative documents, including audited overhead rates, current and on file with WSDOT Audit Office. The DBE goal for this project, determined by WSDOT Local Programs, is twenty-one (21) percent. Scope of Work and Technical Requirements In general, the selected consultant is expected to develop Plans, Specifications, and Estimates (PS&E) for 30% design of the above referenced project. o March 25, 2024 Deadline for Questions - 5:00 PM The Citys RFQ Coordinator for this project is: Name: Minna Yan, Ph.D., P.E. Address: City of Kirkland, Public Works 123 5th Avenue, Kirkland, ashington 98033 E-mail: MYan@kirklandwa.gov

Post-Bid

Roads / Highways

$3,500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
114
Bidding Soon
1,815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

May 31, 2024

Project location map

108th Ave NE, Kirkland, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.