BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2023 at 8:00 PM

Updated November 15, 2023

Site work for a water / sewer project in Holton, Kansas. Completed plans call for site work for a water / sewer project.

Questions about the meaning or intent of the Bidding Documents shall be directed to Engineer. Interpretations or clarifications deemed necessary by Engineer in response to such questions will be issued by Addenda. Questions received less than 7 days prior to the bid opening date may not be answered. Bids will be received for a single prime contract. Bids shall be on a lump sum and unit price basis. Major items of work include: Water distribution system improvements including: 451 l.f. of 8" AWWA C900 PVC water line; 145 l.f. of 16" stell casing highway bore; 205 l.f. of directional bore; 41 l.f. of 1" service connections; 4 l.f. of 2" service connections; 2 gate valves; paving; seeding; traffic control; and appurtenances. An additional 303 l.f. of 6" AWWA C900 PVC water line; 65 l.f. of directional bore; gate valves; seeding; traffic control; and appurtenances will be bid as an additive. Contractor will be required to have all construction materials on site prior to commencing construction. This project is self-funded. Prevailing wage and AIS provisions do not apply. The date that the Bidding Documents are downloaded by the contractor will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda, if any, obtained from sources other than the Issuing Office. Owner reserves the right to waive irregularities and to reject bids. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Payment for the various priced items set forth in the Bid Schedule shall constitute full compensation to Contractor for providing all plant, equipment, machinery, materials, tools, supplies, transportation, labor, operations, and all other property, services, and expenditures required to furnish, perform, and complete the Work in accordance with the Contract Documents. No separate payment will be made for any item not specifically set forth in the Bid Schedule, and all costs for necessary Work not specifically set forth in the Bid Schedule will be deemed to be included in prices for the most applicable priced items.

Award

Water / Sewer

$252,593.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
69
Bidding Soon
1,120
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

October 15, 2023

Project location map

W 5th St, Holton, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.