BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Saint Charles, Missouri. Completed plans call for site work for a water / sewer project.

The Project work shall include the following description of the work: Frontier Park Stormwater Discharge includes installation of approximately 292 linear feet of 48-inch storm sewer, 204 linear feet of 18-inch storm sewer, with structures. Bank stabilization with approximately 515 cubic yards of large (18-24 inch) stone rip-rap. Project also includes removal of existing improvements, necessary grading, and site restoration. Rose Brae Storm Pipe Repair includes removal of existing 72-inch concrete pipe with installation of approximately 30 feet of 72-inch RCP and 72-inch RCP Flared End Section. Grading of creek bank and new stilling basin with installation of MSD type 8 heavy stone revetment with fabric, as well as a 12-inch to 18-inch rock filtration berm. Project includes removal of existing improvements, stump and brush removal, necessary grading, soil haul in, and site restoration. The bid shall be accompanied by a bid deposit (guaranty) for the amount equal to five percent (5%) of the total bid amount. The bid deposit may be in the form of a bid bond issued by an insurance company authorized to do business in the state of Missouri and with a financial strength rating of A with a financial size category of IX or better by A. M. Best, a certified check or a cashier's check drawn on a bank located in St. Charles County, the City of Saint Charles, St. Louis County, or the City of St. Louis. The bid deposit shall be forfeited to the City if the bidder does not execute a contract for the Project and provide all bonds, insurance requirements and other required documents by the date stated in the bid award. The City reserves the right to require the bidders to provide proof of the ability to properly finance and execute the Project together with a record of successful completion of similar projects. The City reserves the right to reject any and all bids or to advertise for new bids. The City reserves the right to defer the acceptance of any bid and the execution of a contract for up to one hundred twenty (120) days after the date of bid opening. The successful bidder shall execute the Project contract and deliver all bonds and other required documents by the date stated in the bid award. The successful bidder shall furnish a performance and payment bond for one hundred (100%) percent of the contract amount and shall provide certificates of insurance and insurance policy endorsements for workers compensation, commercial general liability, auto liability, property damage and other policies of insurance as stated in the bid specifications and in the amounts stated therein for the therein stated policy periods. An additional separate guarantee performance bond in the amount of 10% of the contract amount shall be delivered at time of contract execution to guarantee satisfactory performance of the work completed for a period of two (2) years after the date of acceptance of the work. Project work shall commence for the Rose Brae Storm Pipe Repair site work within seven (7) calendar days after the date of written notice from the City to start work and shall complete all work on the Rose Brae Storm Pipe Repair site within sixty (60) calendar days after the expiration date of the seven (7) day period. Work shall commence on the Frontier Park Discharge site on or after 10/02/23 and shall complete all work (with exception for the asphalt road and chip seal surfacing) on the Frontier Park Discharge site within seventy-five (75) calendar days after 10/02/03. See Job Special Provisions for more information. Questions regarding the plans and specifications must be submitted in writing to the City of Saint Charles Department of Engineering. All questions will be received until 3:00 p.m. local time on 08/11/2023 at which time no additional question will be addressed. City of Saint Charles, Missouri C/O Alex Weidenbenner Department of Engineering 200 North Second Street, Room 202 St. Charles, Missouri 63301 alex.weidenbenner@stcharlescitymo.gov

Award

Water / Sewer

$512,057.00

Public - City

Site Work

8

9

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
30
Bidding Soon
820
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

October 2, 2023

img_map_placeholder

Multiple Locations, Saint Charles, MO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.