BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and paving for a civil project in Sacramento, California. Conceptual plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and for the demolition of a bridge / tunnel.

The City of West Sacramento is soliciting Statements of Qualifications from qualified firms or individuals ("Proposer") to provide professional engineering consulting services in a management support role for two infrastructure projects, the I Street Bridge Replacement and I Street Bridge Deck Conversion projects, submitted as two separate Cost Proposals (Task 1 and Task 2) under one contract. The purpose for the City issuing this solicitation is to retain a qualified consultant in a management support role (CMSR) to manage and oversee the I Street Bridge Replacement and I Street Bridge Deck Conversion projects. Task 1: I Street Bridge Replacement Project (CIP 10033) The I Street Bridge (Bridge No. 22C0153) is a historic, double-deck swing-bridge and it serves as a vital link over the Sacramento River between West Sacramento's historic Washington District, CalSTRS and The Ziggurat buildings, and Sacramento's Sacramento Valley Station, Old Sacramento, and Sacramento's Central City. The I Street Bridge Replacement Project, led by the City of Sacramento, is currently in the right of way and final design phase to construct a new movable bridge upstream of the existing historic I Street Bridge. The bridge replacement project will demolish the approach viaducts to the exiting bridge, connect with C Street in the City of West Sacramento and Railyards Boulevard in the City of Sacramento, and provide access for automobiles, bicycles, transit, and pedestrians on the new structure. The project has completed the 65% design phase and is anticipated to begin 95% design in Winter 2023 with advertisement for construction by the end of 2025. Task 2: I Street Bridge Deck Conversion (CIP 14028) The City of West Sacramento, in cooperation with the City of Sacramento, is leading the I Street Bridge Deck Conversion for Active Transportation Project to repurpose the upper bridge level to a facility dedicated for bicycles and pedestrians while maintaining rail service on the bottom deck. The Project proposes to construct four (4) bicycle/pedestrian access ramps that comply with the Americans with Disabilities Act (ADA) at each quadrant, with two access ramps on both sides of the river for connection. In the City of West Sacramento, the ramp at northwest corner of the existing bridge would connect to the West Sacramento Riverwalk that runs along the top of the Sacramento River levee while the ramp at the southwest corner would connect to the existing path that leads to the Riverwalk Park south of the Project. In the City of Sacramento, the northeast ramp would connect to the Sacramento River Bike Trail that runs along the top of the Sacramento River levee while southeast ramp would connect to the Sacramento Valley Station. The southeast ramp would also provide maintenance and emergency access to the existing I Street Bridge top deck. The approved Project Report does not include any modifications to the upper bridge level. This Project is anticipated to only include striping of the upper bridge deck for the repurposed bridge. Preliminary engineering and environmental documents complying with the California Environmental Quality Act (CEQA) were prepared and approved for this Project to construct the four (4) ADA-compliant access ramps. A Project Feasibility Study was prepared prior to the Project Report that considered mix-use improvements options on the upper bridge deck to enhance safety and mobility for bicyclists and pedestrians. Contact Information David Wong Principal Engineer 1110 West Capitol Avenue West Sacramento, CA 95691 Email: davidwo@cityofwestsacramento.org Phone: (916) 617-4669. Question Submission Deadline:December 29, 2023, 5:00pm Question Response Deadline:January 5, 2024, 12:00pm The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this RFQ in its entirety.

Conceptual

Bridges / Tunnels

$2,500,000.00

Public - City

Demolition, Paving, Site Work

11

8

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
82
Bidding Soon
1,532
All Active Projects
636
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2025

img_map_placeholder

I St, Sacramento, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.