BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Ashland, Oregon. Contact the soliciting agency for additional information.

Tree Removal for Ashland Parks and Recreation Following is a list of trees to be removed. All are dead Douglas-firs, unless otherwise noted. Begin in Lithia Park at the corner of Nutley St. And Granite St. and head south on Granite: Across from 135 Granite. Tree has low branch starting about one-foot above ground level. 32" DBH (25"+7"). Downslope and south of #1. 16" DBH. Upslope and south of #2. 14" DBH. Upslope and south of #3. Across from 139 Granite. 22" DBH. South of #4. Across from 143 Granite. 26" DBH juniper. Across from 163 Granite. South of path. 31" DBH. Across from 189 Granite. North of Japanese Garden and truck entrance. 32" DBH. NE of #7. 30" DBH. NE of #8. 34" DBH. NW of #9. 28" DBH. South of #7 and truck entrance, near corner of Japanese Garden. 3311 DBH. Across from 247 Granite. Down slope. 15" DBH. Across from 251, 255, 257 Granite driveway, down toward Winburn, above Upper Duck Pond. 30" DBH. SW (upslope) of #13. 26" DBH. 50 yds. south of #14. Across from 263 Granite steps. 24" DBH. Southernmost parking lot of Lithia Park, just beyond and across from 423 Granite. Behind restroom. Leaning over parking lot. 43" DBH. The following two trees are in the Oredson-Todd Woods. Access is from the driveway of 2285 Sam Evans Place (off of Green Meadows Way). Park at the end of Sam Evans Place and walk up the dirt driveway (or the trail below) about 100 yards past the house. When you are doing the work there, you will be able to drive vehicles up the driveway to the trees. Above trail. 27" DBH. Beyond #17 and just below trail, growing right next to oak. 25" DBH. Remember to submit two bids: Full cleanup, which includes removal of all brush and wood. No cleanup. Brush and wood can be left on site but must be moved off of the street. Traffic and pedestrian control will be the responsibility of the contractor. The successful contractor will be required to enter into a contract with the City for the services and provide insurance certificates in their own name for General Liability, Automobile and Workers' Compensation. Workers' Compensation insurance is mandatory. Subcontracting will not be permitted. Project completion required by (date): TDB APRC will work with the contract on scheduling, Completion by the Fall of 2023

Post-Bid

Playgrounds / Parks / Athletic Fields

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
10
Bidding Soon
123
All Active Projects
62
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 8, 2023

img_map_placeholder

Granite St & Nutley St, Ashland, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.