Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Jenny Lake, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; 90-space sidewalk / parking lot; and sidewalk / parking lot.
REQUIREMENT: NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million. Estimated Price Range: Approximately $10 -$20 Million The Moose-Wilson Road Phase 2 project will is located on Moose Wilson Road starting at its intersection with Teton Park Road (MP 0.0) and ending at the Laurance S. Rockefeller Preserve (MP 4.8). The work will include the construction of a new alignment, reconstruction of existing roadway, construction of a new 4-way intersection and bicycle transition and final landscape/reclamation efforts, including reclamation of the current roadway alignment to be abandoned. The work will also include the reconstruction of the intersection of Moose Wilson Road and Death Canyon Entrance, reconfiguration of the winter turnaround, relocation of the trailhead and the construction of an 80 to 90 vehicle parking area located at the end of existing pavement (Death Canyon Road MP 0.65). No work is planned between approximately MP 0.8 and the winter turnaround immediately north of the Death Canyon Road (approximately MP 3.0). Technical Questions - All technical questions must be submitted by email wfl.plan.s5pec@dofgov . The primary objective of the proposed contract is to implement the long-term vision and comprehensive management strategies identified within the Moose-Wilson Corridor Final Comprehensive Management Plan/EIS. Phase 2 will complete that vision for the northern portion of the corridor and Death Canyon Road from its entrance to the Death Canyon Trailhead. The estimated period of performance is winter 2023/2024 through summer 2025. Project Location and Type of Work - All project work is located in Grand Teton National Park Teton County, Wyoming. o Moose Wilson Road o Reconstruction (Death Canyon Road to Laurance S. Rockefeller Preserve Entrance) - Work on this section includes grading, drainage, base, paving, and culvert construction. o Realignment (Located near M.P. 0.0 - 0.6) - Work consists of clearing, grading, base, paving and roadway obliteration. o Residence Demolition - work consists demolition and removal of existing structures and infrastructure. o Death Canyon Road o Overlay - Work on this segment consists of patching, milling and paving. o Culvert Replacement - Work consists ofreplacement of existing corrugated metal pipe culvert with larger concrete box culvert. o Death Canyon Trail Head Parking lot - Work consists of grading, base, paving, curb, gutter, and sidewalks. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project No. WY NPS GRETE 2020(1)
GC Bidding
Roads / Highways
$20,000,000.00
Public - Federal
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 19, 2024
January 20, 2025
Moose Wilson Rd, Jenny Lake, WY
Related To This Project
Jenny Lake, WY
Bid Date: Jul 08 2024
Jenny Lake, WY
Bid Date: Jul 20 2023
Jenny Lake, WY
Bid Date: Aug 14 2023
Jenny Lake, WY
--
Iron Mountain, WY
Bid Date: Aug 30 2023
Sheridan, WY
Bid Date: Aug 09 2023
Big Piney, WY
--
Clearmont, WY
--
Torrington, WY
Bid Date: Aug 30 2023
Wheatland, WY
Bid Date: Jul 26 2023
Cheyenne, WY
Bid Date: Aug 30 2023
Cheyenne, WY
Bid Date: Aug 10 2023
Lusk, WY
Bid Date: Jul 25 2023
Torrington, WY
Bid Date: Aug 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.