BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a detention facility in Castle Rock, Colorado. Completed plans call for the remodel of a detention facility.

Reference Number 0000326399 The Department of Facilities, Fleet and Emergency Support Services of Douglas County Government, hereinafter referred to as the County, respectfully requests bids from responsible and qualified contractors for all materials and services required to complete the construction of the Clerk of the Courts Service Counter Remodel Project. Question Acceptance Deadline 08/14/2023 at 4:00 PM MT Questions are submitted online No General Requirements - Contractors License Required - Employee Background Checks Required - FOB Destination - Insurance Required - License Required - Local Service Required - Payment by Credit Card - Security Badges - Warranty Information Required Bonding Requirements - Bid Bond 5 % The County reserves the right to waive any technical or formal errors or omissions and to reject any and all bids, or to award a contract for the items herein, either in part or in whole, if it deems it to be in the best interest of the County to do so. All questions related to this IFB must be directed to the attention of Carolyn Riggs, Purchasing Supervisor, 100 Third Street, Suite 130, Castle Rock, Colorado 80104, 303-660-7434, criggs@douglas.co.us. All questions must be in writing and responses will be shared with all potential respondents, as appropriate. The Douglas County Clerk of the Court's office suite located within the Douglas County Justice Center must be remodeled. This project consists of remodeling the current public counter space and Clerk of the Court office into increased public counter space, additional office space, and an open office area. Affecting approximately 1,550 square feet of existing space. The project will include, but not be limited to, demolishing portions of the existing building, creating new office spaces, and creating a new public service line. Full-height gypsum wallboard partition walls and new office finishes are required throughout. As a part of this project, the new counter space, office space, and open office area will receive floor leveling and new floor finishes, including carpet tile along with a new carpet base, and the walls will be painted. The electrical, lighting, and HVAC will also be modified as required to support the new floor plan configuration. This office suite will be partially occupied during construction. The contractor shall account for, protect, and preserve the working environment for the adjacent County employees during the scope of the work. The County will remove furniture, artwork, electronics, and non-attached furnishings as required to assist during construction

Post-Bid

Jails / Prisons

Public - County

Remodeling

16

16

2

4

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
105
Bidding Soon
1,587
All Active Projects
688
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 28, 2023

September 27, 2023

December 15, 2023

img_map_placeholder

4000 Justice Way, Castle Rock, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.